My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-2019 Council Packet
Orono
>
City Council
>
2019
>
06-24-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:28:13 AM
Creation date
9/24/2019 10:23:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Park Dedication Fee $ 5,550.00 <br />Storm Water and Drainage Trunk Fee 8,060.00 <br />Escrow $ 2,000.00 <br />Total Cash Requirements $ 15,610.00 <br />25. WARRANTY. The Developer warrants all Improvements against poor material <br />and faulty workmanship. The warranty period for streets is one year. The warranty period for <br />underground utilities is two years and shall commence following completion and acceptance by the <br />City Council. The one year warranty period on streets shall commence after the final wear course <br />has been installed and accepted by the City Council as documented in official City minutes. The <br />Developer shall post a maintenance bond, letter of credit or cash deposit (the "Maintenance <br />Security") in an amount reasonably determined by the City Engineer. The City Engineer shall <br />examine the condition of the Improvements when determining the amount of the Maintenance <br />Security. The City shall retain ten percent (10%) of the security until the Maintenance Security is <br />furnished the City or until the warranty period expires, whichever first occurs. The retainage may <br />be used to pay for warranty work. The City standard specifications for utilities and street <br />construction identify the procedures for final acceptance of streets and utilities. <br />26. RESPONSIBILITY FOR COSTS. <br />A. Except as otherwise specified herein, the Developer shall pay all costs <br />incurred by it or the City in conjunction with the development of the Land, including but not limited <br />to Hennepin County Environmental Services and Minnehaha Creek Watershed District charges, <br />legal, planning, engineering and inspection expenses incurred in connection with approval and <br />acceptance of the Plat, the preparation of this Contract, review of construction plans and documents, <br />and all costs and expenses incurred by the City in monitoring and inspecting development of the <br />Land. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.