Laserfiche WebLink
FILE#LA19-000069 <br /> 16 Sept 2019 <br /> Page 2 of 10 <br /> LOT ANALYSIS WORKSHEET(Requested Variances are Highlighted) <br /> Section 78-78-350&78-1279 Setbacks: <br /> LR-1C Required Existing Proposed <br /> 30' building ±18' house ±12' house <br /> Front (Street) ±6 detached garage -2'—0' retaining walls <br /> Rear 30' 3.5' 6.3' house <br /> NE Side 10' 56' house 33.6' <br /> SW Side 10' 51' house 31.08' <br /> 14.5' detached garage <br /> ±49' house ±41' house <br /> Lakeshore 75' ±41' detached garage ±30' new walls <br /> (various) <br /> The existing detached garage encroaches approximately 8 feet <br /> lakeward of the average lakeshore setback line;the house is currently <br /> conforming. <br /> Average Lakeshore <br /> The applicant's proposed building improvements are shown to meet <br /> the average lakeshore setback. There are walls proposed within the <br /> average lakeshore setback which are for the most part at or below <br /> 42".The applicant has indicated the walls may be revised. <br /> *After meeting onsite with staff,the applicant verbally agreed to remove the walls,though no <br /> revised drawings have been submitted. <br /> Section 78-350-Lot Area/Width: <br /> LR-1C Lot Area Lot Width <br /> Required 21,780 s.f. (0.5 acres) 100' <br /> Actual 11,100 s.f. (0.25 acre)* 149' @ 75'/ 149' @ OHWL <br /> *The total lot area excludes the bituminous, travelled area of Crystal Bay Road;therefore 14,459 <br /> (total)—3,359(road) =11,100 square feet. <br /> Section 78-1403-Structural Building Coverage: <br /> Total Lot Area Total Structural Coverage <br /> 11,100 s.f. (0.25 acre) Allowed: 2,220 s.f. (20%) <br /> Existing: 1,226 s.f. (11%) <br /> Proposed: 3,454 s.f. (31.1%) <br /> Section 78-1680 and 78-1700-Hardcover Calculations: <br /> Stormwater <br /> Total Area Allowed Existing <br /> Overlay District in Zone Hardcover Hardcover Proposed Hardcover <br /> Tier <br /> 2,775 s.f. 3,666 s.f. 5,509 s.f. <br /> Tier 1 11,100 s.f. (25%) (33%)** (49.6%) w/in 75' <br /> **Note, the existing conditions hardcover calculations do not identify 75 foot zone hardcover <br /> separately. <br /> IUP for export of approximately 1,120 cubic yards of material to be hauled from the property <br /> within 75-foot setback and off site is also requested. <br />