Laserfiche WebLink
°moo CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 7 0 1 2 <br /> l�kESHo¢� <br /> Letter of Credit and escrow to ensure that all site improvements are installed and <br /> maintained to the City's specifications and satisfaction, and to establish conditions for <br /> future development of the site. <br /> 6. Payment of development fees as follows: <br /> Engineering, City Administration(escrow) $4,000.00 <br /> Park Dedication Fee 33,300.00 <br /> Storm Water and Drainage Trunk Fee 48,360.00 <br /> Water Connection Charge 29,680.00 <br /> Sewer Connection Charge 36,575.00 <br /> Final Plat Fee 500.00 <br /> Total Cash Requirements&Fees $152,415.00 <br /> WHEREAS,City staff and consultants have reviewed the plans for this subdivision <br /> and hereby specify approval of each plan and identify them as part of the official record for Willow <br /> Bay Sanctuary, all attached as Exhibit B: <br /> Plat of Willow Bay Sanctuary <br /> Sheet A: Signature Page <br /> Sheet B: Lots 1-3 <br /> Sheet C: Lots 4-7 <br /> Construction Drawings <br /> Sheet 1: Title Sheet (dated 7-10-19) <br /> Sheet 2: Existing Conditions (dated 7-10-19) <br /> Sheet 3: Grading Plan(dated 7-10-19) <br /> Sheet 4: Street Plan&Profile (dated 7-10-19) <br /> Sheet 5: Utility Plan and Profile (dated 7-10-19) <br /> Sheet 6: Erosion Control and SWPPP (dated 7-10-19) <br /> Sheet 7: Detail Sheet (dated 7-10-19) <br /> Sheet 7: Detail Sheet (dated 7-10-19) <br /> Sheet 9: Detail Sheet (dated 7-10-19) <br /> All of the above noted plans are subject to any additional requirements of the Minnehaha Creek <br /> Watershed District and the City Engineer. <br /> Page 2 of 4 <br />