Laserfiche WebLink
BBC- Reeves HELICAL PIER INSPECTION RECORD 3310 Watertown Rd, Orono, MN <br /> Design Requirements Extensions Pressure <br /> record length) netpsi) <br /> 1 1 -T tri le lead <br /> (Pier Number) Required Allowable Load 2 kips 1 -T extension 900 <br /> 717/2016 Required Ultimate Load 4 kips <br /> (Date Installed) Required Torque 444 ft-lbs <br /> PB <br /> (Installer Initials) Required Pressure 211 psi <br /> 14'total depth <br /> Design Requirements Extensions Pressure <br /> record length) netpsi) <br /> (Pier Number) Required Allowable Load kips <br /> Required Ultimate Load 0 kips <br /> (Date Installed) Required Torque 0 ft-lbs <br /> (Installer Initials) Required Pressure 0 si <br /> Design Requirements ::1 Extensions Pressure <br /> record length) netpsi) <br /> (Pier Number) Required Allowable Load kips <br /> Required Ultimate Load 0 kips <br /> (Date Installed) Required Torque 0 ft-lbs <br /> (Installer Initials) Required Pressure 0 si <br /> Design Requirements Extensions Pressure <br /> record length) netpsi) <br /> (Pier Number) Required Allowable Load kips <br /> Required Ultimate Load 0 kips <br /> (Date Installed) Required Torque 0 ft-lbs <br /> (Installer Initials) Required Pressure 0 si <br /> Pressure is defined as: supply psi-back psi = net psi Ratio of Pressure to Torque: 1:2.1074 <br /> Ratio of Torque in ft-lbs to Ultimate Capacity (Cu) in kips: 1:.009 Safety Factor= 2 <br /> Formula to calculate Ultimate Capacity (Cu) in kips: Cu = Torque (ft-lbs) x.009 <br /> Formula to calculate Allowable Capacity (Ca) in kips: Ca= Cu/Safety Factor of 2 <br />