Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: 6/'uTJ©wo60,4Permit No.:Zq Me� � <br /> � 1 <br /> Description of work: �/Z 7 el"tor, e-t*700�& Date Rec'd: <br /> Septic review by: �= Date Approved:_ 2 Z <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: A0 <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: 0 Yes 0 No Date of Survey: Revised date(?): <br /> Landscape plan submitted? 0 Yes 0 No Landscaper: <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak eight: FF FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50% = L.F. below grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL PACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance be en the to st proposed Slab at or above grade— <br /> START WITH floor(of the basem nt or cra space)and measure from highest existina <br /> the highest point of he roof START WITH grade to the highest point of the <br /> roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION GABLE OR HIP ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtr t half the distance from highest existing grade to the <br /> ROOF TYPE) between the hig st point of the roof highest point of the roof. <br /> to the low point f he corresponding If you have a... <br /> gable or hipped ro SUBTRACTION GABLE OR HIPPED ROOF <br /> • GABLE OR HI PE ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Su tract alf the distance ROOF TYPE) the distance between the <br /> between the p of th highest highest point of the roof to <br /> window and a highe t point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHE ROOF TY ES(flat, GABLE OR HIPPED ROOF <br /> mansard, c):No subtr ction. (with windows): Subtract <br /> SUBTRACTION Subtract the dis nce between he half the distance between <br /> (BASED ON basement/crawl pace floor an the the top of the highest <br /> EXISTING highest existing rade adjacent the window and the highest <br /> GRADES) foundation OR 1 feet(whicheve is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />