My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P07458 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3310 Watertown Road - 32-118-23-44-0015
>
Septic
>
2004-P07458 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:42:29 PM
Creation date
8/21/2019 1:30:53 PM
Metadata
Fields
Template:
x Address Old
House Number
3310
Street Name
Watertown
Street Type
Road
Address
3310 Watertown Road
Document Type
Septic
PIN
3211823440015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM Geotextile fabric <br /> 1. Select number of perforated lateralsQuarter inch perforations spaced. ®3' i2 <br /> 2. Select perforation spacing= 3 ft s":of rock <br /> Perf Sizing 3/16"-1/4" <br /> 3. Since perforations should not be placed closer than 1 foot to Perf Spacing 15-5' <br /> the edge of the rock layer (see diagram),subtract 2 feet from <br /> the rock layer length. E-4: Maximum allowable number of 1/4-inch perforaffons <br /> per lateral to guarantee<10%discharge variation <br /> o c =yer length -2 ft = �0 ft perforation <br /> 4. Determine the number of spaces between perforations. spacing <br /> feet 1 Inch 1.25 Inch 1.S inch 2.0 inch <br /> Divide the length(3)by perforation spacing(2) and round <br /> down to nearest whole number. <br /> 2.5 8 14 18 28 <br /> Perforation spacing= GO ft+ ft= ko spaces 3.0 8 13 17 26 <br /> � <br /> 5. Number of perforations is equal to one plus the number of 3.3 7 12 16 254.0 7 11 15 23 <br /> perforation spaces(4). Check figure E-4 to assure the number of 5.0 6 10 14 22 <br /> perforations per lateral guarantees <10% discharge variation. <br /> _ao spaces+1 = a 1 perforations/lateral E-6: Perforation Discharge In gpm <br /> 6. A. Total number of perforations= perforations per lateral (5) perforation diameter <br /> times number of laterals (1) head Inches <br /> _perfs/lat x�_lat= (®3 (feet) 3/16 7/32 1/4 perforations 1.00 0.42 0.56 0.74 <br /> B. Calculate the square footage per perforation. 2.0b 0.59 0L11 <br /> 80 1.04 <br /> Should be 6-10 sqft/perf.Does not apply to at-grades. <br /> Rock bed area = rock width (ft)x rock length(ft) 5.0 0.96 1.65 <br /> /O ft X (O-L- ft= (D'o1O Sqft a Use 1.0 foot e-family homes.Square foot per perforation=Rock bed area +number of perfs (6) b Use 2.0 feet nin else. <br /> (oPL0sgft+__p_7�_perfs =_2-.�sgft/pert <br /> SUUNFMD LOCATED AT END Or PRES"E DISTRIBUTION SMB <br /> 7. Determine'required flow rate by multiplying the total number of <br /> perforations (6A) by flow per perforation(see figure E-6) Zra <br /> (41> perfs x gpm/perfs=42-gpm <br /> 8. If laterals are connected to header pipe as shown on upper ; <br /> example,to select minimum required lateral diameter;enterWIVE <br /> �,,, '"` <br /> figure E-4 with perforation spacing (2) and number of perforations ��``d <br /> per lateral (5) Select-mini um diameter for <br /> uVou+Of rcWwno wtuTa•u nal <br /> perforated lateral= inches. FMWAE°I" "',N, <br /> "NN IN WUND <br /> .[MYMRO IWiK.K <br /> 9. If perforated lateral system is attached to manifold pipe nearIND <br /> the center,lower diagram,perforated lateral length(3) and <br /> number of perforations per lateral(5)will be approximately one <br /> half of that in step 8. Using these values,select minimum <br /> diameter for perforated lateral= 0-6 inches. <br /> �Md <br /> I hereby certify that I have completed this work in accordance with applicable ordinances, rules and laws. <br /> ��� 7 (signature) (license#) _ 3-)f?-0!4_ (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.