Laserfiche WebLink
.� ' CITY OF ORONO <br /> r SEPTIC SYSTEM APPROVAL <br /> Q <br /> 1�L� CITY of ORONO <br /> 'i L`w lr ~ �'• <br /> Municipal Offices <br /> Post Office Box 66 <br /> Crystal Bay,Minnesota 55323-0066 <br /> kESli0g <br /> LOCATION: 3280 Watertown Rd. <br /> OWNER: Doug Hart <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S-P Testing REPORT DATE: December 22, 1997 <br /> The City of Orono has Approved your on-site system design as of March 11, 1998 <br /> (approved-disapproved) (date) <br /> with the following cominents: A staff variance is granted for the mound location on slopes <br /> greater than 6% (the slope is 7%) . <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF O ONO <br /> By <br /> Stephen We an, On-site Systems Manager <br /> TELEPHONE-473-7357•FAX-473-0510 <br />