My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: variance application
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Place
>
1330 Cherry Place - 08-117-23-32-0026
>
Correspondence
>
Re: variance application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:44:07 PM
Creation date
8/21/2019 12:37:25 PM
Metadata
Fields
Template:
x Address Old
House Number
1330
Street Name
Cherry
Street Type
Place
Address
1330 Cherry Place
Document Type
Correspondence
PIN
0811723320026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 30, 2013 <br /> Lin Yan <br /> 1330 Cherry PI <br /> 952-40 - 1 (W) <br /> 651-428-0889 (C) <br /> lyan@uswestfinancial.com <br /> RE: File#13-3623 <br /> To whom it may concern: <br /> We have submitted the above referenced variance application through the contractor.The deadline was <br /> missed due to the delay on the survey. Our application is forced to be delayed by one more month (to <br /> October, 2013). <br /> Due to the weather in Minnesota, it is almost impossible to finish the entire project in 2013 starting in <br /> October.The variance application does include the new driveway and necessary drainage in the front <br /> yard.This part of the project is not within 75 feet of the lake shore and is not subject to variance <br /> restrictions. <br /> The current drive way is damaged and very narrow. In addition, we are having water issues in basement <br /> due to poor grading of the front yard.A temporary plastic cover is being used to prevent the water <br /> intrusion at this time. We must correct the water problem permanently ASAP to protect our investment. <br /> The proposed new driveway is in conjunction with the water drainage in the front yard, and must be <br /> done before winter. <br /> I would like to apply for an exception so we can start the new drive way and water drainage (not subject <br /> to variance restrictions) in front yard before the variance application is finalized in October. <br /> Thank you for your kind consideration. I am looking forward to hearing from you soon. <br /> Sincerely, <br /> Lin Yan, home owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.