My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
08-19-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 9:42:09 AM
Creation date
8/20/2019 9:33:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINNEHAHA CREEK WATERSHED DISTRICT <br /> QUALITY OF WATER QUALITY OF LIFE <br /> MEMORANDUM <br /> TO: Anthon Ellis,Charlie&Co Design <br /> FROM: Grace Barlow,Minnehaha Creek Watershed District <br /> DATE: July 9th,2019 <br /> RE: MCWD Permit#19-300, Stockpile Clarification <br /> This memo is to clarify and approve that Charlie and Co Design have reached out to MCWD in regards to <br /> stockpiling excavated dirt at their 855 Old Crystal Bay Rd S project site in Orono. Charlie and Co Design <br /> plan on storing the dirt on site for two months before removing it-this was not initially outlined in permit <br /> #19-300. They have clarified with the District that perimeter erosion control will be installed around the <br /> stockpile and that it will be stabilized with erosion control blankets. This adheres to the District's Erosion <br /> Control rules. <br />
The URL can be used to link to this page
Your browser does not support the video tag.