My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-2019 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2019
>
08-19-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 9:42:09 AM
Creation date
8/20/2019 9:33:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date Application Received: 07/17/19 O�T <br /> Date Application Considered as Complete:07/17/19 <br /> 60-Day Review Period Expires: 09/15/19 <br /> y <br /> To: Chair Ressler and Planning Commission Members et <br /> Dustin Rief, City Administrator q&ESHO0` <br /> From: Melanie Curtis, Planner WOG <br /> Date: 19 August 2019 <br /> Subject: #LA19-000054,John Kraemer&Sons o/b/o OCBR 1 LLC, 855 Old Crystal Bay Rd S <br /> Public Hearing: IUP—Export 500+cubic yards of material <br /> Application Summary: The applicant is requesting an interim use permit to export <br /> approximately 3,200 cubic yards of material in conjunction with construction of a new <br /> residence. <br /> Staff Recommendation: Planning Department Staff recommends approval with conditions. <br /> Background <br /> A new home is being built at 855 Old Crystal Bay Road South.The project will involve the export <br /> of approximately 3,200 cubic yards of material from the site to accommodate the proposed <br /> home; an interim use permit(IUP) is required. The export of the material is what triggers the <br /> IUP. From the site,the haul route proposed by the applicant is: north on Old Crystal Bay Road S <br /> to County Rd 112;then west on County Rd 112/Highway 12 to Maple Plain. <br /> Note,the property and adjacent properties are undergoing a boundary line adjustment not yet <br /> reflected in the Hennepin County online information. Exhibit B illustrates the approved lot <br /> orientations. "Parcel 2" is the subject property. <br /> Section 78-330-Lot Area/Width: <br /> LR-1A Lot Area Lot Width <br /> Required 87,120 s.f. (2.0 acres) 200' <br /> Actual 107,576 s.f.± (2.4 acre) ±299' <br /> Applicable Regulations: <br /> Interim Use Permit (Code Section 78-1726(a)(6)) <br /> The construction of the new home will result in 3,200 cubic yards of unneeded material.The <br /> applicant proposes to export this from the site out of the city. It is currently being stockpiled on <br /> site (see Exhibit C).The proposed home will not be out of character with the neighborhood. <br />
The URL can be used to link to this page
Your browser does not support the video tag.