My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P08026 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3220 Watertown Road - 32-118-23-44-0018
>
Septic
>
2004-P08026 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:42:36 PM
Creation date
7/30/2019 11:16:01 AM
Metadata
Fields
Template:
x Address Old
House Number
3220
Street Name
Watertown
Street Type
Road
Address
3220 Watertown Road
Document Type
Septic
PIN
3211823440018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perforation Discharges in GPM <br /> Pressure Distibution Head Perforation diameter <br /> feet inches <br /> 3.a. Select number of perforated laterals 7/32 1/4 <br /> b. Select perforation spacing= feet. 1.0a 0.56 0.74 <br /> C. Subtract 2 ft. from the rock layer length. 1.5 0.69 0.90 <br /> Rock layer length <br /> -2 ft. = feet. 2.Ob 0.80 1.04 <br /> d. Determine the number of spaces between perforations. a Use 1.0 foot single homes. <br /> Length perf.spacing= ft.-1- ft.= spaces <br /> b Use 2.0 feet for anything else. <br /> e. spaces+1 = perforations/lateral <br /> f. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. rrar x per S, era = perforations. <br /> g. T Mr X gpm ,,er = gpm. <br /> SELECTED PUMP CAPACITY gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> /O feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Soil ceaunentsystem <br /> required at manifold if gravity system,zero. °•°=" <br /> a,' feet Total pipe length <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. we oNa,ar,Ddfffef <br /> Read friction loss in feet per 100 feet from table(F-14). pig <br /> ------- -- - <br /> F.L._z o ry ft./100 ft of pipe <br /> ---- <br /> b. Determine total pipe length from pump to discharge <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length-1.25 times pipe length= <br /> .ZPU x 1.25= ZcSO feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft by equivalent pipe length. Nominal <br /> pipe dia. <br /> Total friction loss= Z-%S'O x Z.D(=100=-S feet How Rate <br /> 4. Total head required is the sum of elevation difference, gpm 1.5" 2" 3" <br /> special head requirements,and total friction loss. <br /> /D 20 2.47 0.73 0.11 <br /> + <br /> �I + %S 25 3.73 1.11 0.16 <br /> (1) (2) (30 30 5.23 1.55 0.23 <br /> 6.96 0.30 <br /> o 8.91 0.39 <br /> TOTAL HEAD Zd feet 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> C. Pump selection 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> 70 7.44 1 1.09 <br /> 1. A pump must be selected to deliver at least <br /> gpm (Step A) with at least,Zo feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.