Laserfiche WebLink
Today,the easement may not cover all areas of the wetland if the boundaries change <br /> due to delineation. A copy of the drainage easement and plat are attached. <br /> 4. Septic Systems <br /> The septic systems must be located at least 75 feet from the OHWL of Stubbs Bay <br /> Creek and 20 feet from any hardcover. Each lot is required to have a primary and <br /> secondary septic site and their sizes will vary depending on the number of bedrooms <br /> in the proposed structure. Orono code requires that sites with a capability to serve a 5- <br /> bedroom home must be identified. <br /> 5. Access <br /> Outlot A was platted to serve as a shared driveway for Lots 1 and 2 as part of the <br /> 1990 subdivision approval. As a requirement of the subdivision approval, an <br /> engineering plan, illustrating the location of the driveway from Watertown Road to <br /> Lot 1, was required. The plan also showed a wood plank/steel bridge crossing the <br /> Creek on Lot 1. Since the approval,neither the driveway nor the bridge was <br /> constructed, and current codes would prohibit their installation today. <br /> In 1992, the City adopted regulations regarding shoreland management, adding <br /> structural setback and hardcover requirements from tributary streams which did not <br /> previously exist. As a result,the proposed driveway location in Outlot A and bridge <br /> crossing the Creek in Lot 1 are not permitted. By today's regulations, hardcover can <br /> not be located within 75' of the OHWL of Stubbs Bay Creek. The 1991 Wetland <br /> Conservation Act also has potentially severe limitations on buildability of the lots. <br /> Access to both Lots 1 and 2 must be relocated away from the Creek. In order to <br /> accomplish this, replatting of a new access outlot on Lot 2 may be required. An <br /> access outlot would likely be platted 30' in width along the eastern side lot line of Lot <br /> 2, serving as access for both Lots 1 and 2. The following additional requirements <br /> would also apply to each lot: <br /> Lot 2: 1) Driveway Setback 5' from the eastern side lot line within the <br /> access outlot <br /> 2) Building Setback 50' from the access outlot <br /> Lot 1: 1) Driveway Setback 10' from the eastern side lot line within the <br /> access outlot <br /> 2) Driveway Construction requires City and other Agency approvals to <br /> fill a wetland to access the buildable portion <br /> of the lot <br /> As an alternative, access to Lot 1 from the Boyer subdivision to the west has been <br /> suggested instead of through Lot 2/Outlot A. This would require cooperation from the <br /> owners of that subdivision and a replat to create an outlot corridor. <br /> 2 <br />