Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: 32\� a\eGe- Permit No.: ti6 Js <br /> Description of work: NOV *1(N(-1Q - Date Rec'd: 10i I 1 ZUl e <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: <br /> Grading review by: Date Approved: <br /> 41 Ira, <br /> Zoning District:w. Zoning File#: `� � k15-18Z��to=Zb <br /> &ham �� <br /> ' Q ��i�,lp <br /> Resolution? & Reso#: b�0 Reso Date: Signed:4 P \� fro Resolution/NA <br /> Zoning: Lot Area: \010\\0 /AC Width: L7D, Structural Coverage: SF <br /> 1 <br /> Survey Submitted: 4 'es D No Date of Survey: tO I I,L 1 I,b Revised date(?): <br /> Landscape plan submitted? D Yes Landscaper: K190/None proposed <br /> Proposed Setbacks: , <br /> Zo' ,'is '1"'•%,% <br /> Fron ake) Rear(Street) ( N S E ® ) ( N S © W ) Other ildings Wetland <br /> { '1 Side Side <br /> • 3 " VU1 - 1 ` 10.6 on OM <br /> Building Height Analysis: <br /> Distance Between First Floor and defined Top of Roof*(See"building height" (a) �� <br /> definition): <br /> First Floor Elevation (from building plans): (b) OVA.1(5 <br /> Highest Existing ground level (per survey) or 10'above lowest ground level, (c) C - 2 <br /> whichever is lower: <br /> Difference between (b) and (c)*: (d) 2_ 10 <br /> DEFINED HEIGHT <br /> *If highest existing adjacent grade is above FFE-Height is(a)-(d): (e) 2'z <br /> *If highest existing adjacent grade is below FFE-Height is(a) +(d) ~' <br /> Shoreland District MCWD Permit Average Lakeshore Setback Bluff <br /> Met? <br /> Yes D No Permit Number: 0 Yes 0 No 0 Yes N� <br /> 0 N/A-see attached Setback: <br /> Stormwater Quality Existing Proposed <br /> Overlay District Tier Hardcover Hardcover Variance Required CUP Required <br /> (circle one) (% and sf) (% and sf) <br /> / <br /> I 1 G 0 Yes �lo 0 Yes �No <br /> 1 2 3�(ip <br /> 5 �"L �� K/ Types) Type(s): <br /> -G MCNX, ` b 1 fi ti nco s 400 1\b ,t1.0 - -1-2Z <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />