My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00423 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3045 Watertown Road - 04-117-23-22-0028
>
Septic
>
2009-00423 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:09:35 PM
Creation date
7/24/2019 2:14:46 PM
Metadata
Fields
Template:
x Address Old
House Number
3045
Street Name
Watertown
Street Type
Road
Address
3045 Watertown Rd
Document Type
Septic
PIN
0411723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson—WCA License#810 <br /> 11481 Riverview Rd. NE,Hanover,MN 55341 <br /> (763)498-8779 Fax(763)498-8290 <br /> June 25,2009 OROM C WT <br /> Bruce Hall 45Z '" t- <br /> 3045 Watertown Road <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type 1 Three-bedroom home in accordance with <br /> the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 22-24(mottled soil).Due to the periodically saturated soils, <br /> a pressurized mound system will need to be installed to treat the septic effluent.The bottom of the treatment <br /> area must be located at least 3'above the saturated soils. <br /> All neighboring wells are greater than 100 feet from proposed treatment areas. <br /> The soils at a depth of 12"have a percolation rate averaging 3 MPI. <br /> The existing tanks must be abandoned. ORONO COPY <br /> The supply line must be insulated under the driveway. <br /> All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks and a filter <br /> installed on the second tank.Clean outs must be installed on the end of the laterals for maintenance. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with light and sound devices;this is in case of a pump failure.The <br /> manifold and supply line must have back drainage to the pump chamber.The rock and fill materials must <br /> be clean.The sod layer below the entire mounded area must be turned over.Just break up the sod and be <br /> sure not to over work. <br /> Nothing other than gray water,(laundry,showers,etc.) Human water and toilet tissue should be <br /> disposed of into the septic tanks. Garbage disposals are not recommended. Additives must not be <br /> used,•they may cause harmful damage to your septic system. It is recommended that you pump the <br /> tank every year for 1 tank,every two rears for two tanks. <br /> Sincerely, <br /> ORONO COPY (W <br /> Joseph J.Olson WMC <br /> vamcrm L= <br /> & PEOW 106- <br /> Off Allthd411"l1�0 <br /> D0 <br /> APP WaU WVIV CIDRREGtR1N�1�N» <br /> linPAPPRLIYO-MM=4RMWWA 'f <br /> ��� ` '{'lea aa+aw�b aat!btl�6dforawioa.Alt wwk slu�>rs+bli�1 <br /> It!Wt e/eppliap wltb•p spPticsble�ia1 arsMR eaM. <br /> p0 ►� tllli #I : 1 WraAs xu.Uwal <br />
The URL can be used to link to this page
Your browser does not support the video tag.