My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00423 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3045 Watertown Road - 04-117-23-22-0028
>
Septic
>
2009-00423 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:09:35 PM
Creation date
7/24/2019 2:14:46 PM
Metadata
Fields
Template:
x Address Old
House Number
3045
Street Name
Watertown
Street Type
Road
Address
3045 Watertown Rd
Document Type
Septic
PIN
0411723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. MOUND SIZING <br /> A. Calculate Clean Sand lift: 3 feet minus Depth to Limiting Condition (1.C)=Clean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1:8 ft = 1.2 ft <br /> B. Calculate Upslope Height:Clean Sand Lift (4.A)+media depth (1 ft.)+cover (1 ft.)=Upslope Height <br /> 1.2 ft + 10 ft + 1.0 ft= 3.2]ft <br /> Select Upslope Berm Multiplier <br /> C. (based on land slope): 4.00 (figure D-34) <br /> D. Calculate Upslope Berm Width:Multiplier (4.Q X Upslope Mound Height (4.6)=Upslope Berm Width <br /> 4.00 1 x 3.2 ft = 12,0 ft <br /> L Calculate Drop in Elevation Under Bed.-Bed Width (2.6) X Land Slope (1.D)+100=Drop (ft) <br /> 10.0 1 x 8.0 % + 100- 0.8 ft <br /> F. Calculate Downslope Mound Height.Upslope Height (4.6)+Drop in Elevation (4.E)-Downslope Height <br /> 3.2 ft + 0.8 ft = 4.0 ft <br /> Select Downslope Berm Multiplier <br /> G. (based on land slope): 5.88 (figure D-34) <br /> H. Calculate Downslope Berm Width:Multiplier (4.G)X Downslope Height (4.17)=Downslope Berm Width <br /> 5.88 1 x 4.0 ft = 20:0 ft <br /> 1. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.6 or 3.C)+4 ft. =ft <br /> 10:0 ft + ft = 14.0 ft <br /> J. Design Downslope Berm -greater of 4H and 41: 20.0 ft <br /> K. Select Endslope Berm Multiplier: 1 3-00 (wally 3.0 or 4.0) <br /> L Calculate Endsiape Berm (4.K)X Downslope Mand Height (4.F)=Endslope Berm Width <br /> 3.00 1 x 4.0 ft = 12.0 ft <br /> M.Calculate Mound Width:Upslope Berm Width(4.D)+Bed Width (2.6)+Downslope Berm Width (4.J)=ft <br /> 12.0 1 ft + 10.0 ft + 20.0 ft - 42.0 ft <br /> N. Calculate Mound Length:Endslope Berm Width (4.1-)+Bed Length (2.C)+Endslope Berm Width (4.1-)=ft <br /> 12.0 ft + 37.5 ft + 12.0 ft = 61.5 ft <br /> D•34:S1w MukiOw Todds <br /> Lind Slope% 1 0 1 1 1, 2.1,3 '1 4 1>5 1 6 1 7 1 8 1 9 1 10 -111 12 1 13 1 14 1 15 1 16 1 17 1 18,1_19 1 20 1 31-1 22 1 23 1 24 1 25 <br /> UpSlope 3:1 3.OD 2.91 2.83 L75 2.68 2.61 2.S4 2.48 2.42 2.36 2.31 2.26 2-21 2.17 2.13 2.G9 L061 2.03 1 LOCI 1.97 11.9511.931 1.91 1 1.89 I 1.87 I 1.85 <br /> Berns Rad10 4:1 4 3AS 3.70 3.57 3.fi 3.33 3.23 3.12 3.03 2.94 2-86 2:78 7-70 2.62 2.55 2.46 L41 I L35 I L29 I L23 12.18 L13 LLOB I 2.03 11.98 11.93 <br /> Lind-Slope% 1 0 1-1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 It 1 12 113 1:14 1 15 1 16 1 17 1 38 1 19 1 20 1 21 1 22 23 1 24 1 25 <br /> DO'il1 kve 3:1 LODI 3.09 3.15 3.30 3.4I 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 4.95 5.24 5.55 5.88 1 6.24 16.63 17.04 1 7.47 I 7.93 I 8.12 I L93 I 9.•16 I AM <br /> Berm fiatlo 41I 4.OD 4.17.1.35 4.54 4.76 S.00 5.26 5:36 5:88 L25 6.67 7.1.1 7.64 8.29 8.92 9.97 10.7a IL941 11.67 1242 13.19 13.99 114.82115.67116.54 117.W <br /> 5. ORGANIC LOADING:(Optimal) <br /> A. Organic Loading = Design Flow X Estimated CBOD in mg/L in the effluent X 8.35+1,000,000(See Table 111) <br /> I X1 _1mg/L X 8.35+1,000,000 = lbs CBOD/day <br /> L Calculate System Organic Loading:lbs C13W (5.A)+Bed Area (2.A) =lbs/day/fe <br /> lbs/day + fe - lbs/day/fe <br /> Table III (7083.4030) <br /> Treatment CBOD (mg/l.) <br /> Level A 15 <br /> Level B 25 <br /> Level C 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.