My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02386 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3020 Watertown Rd - 33-118-23-33-0001
>
Septic
>
2000-P02386 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:46 PM
Creation date
7/24/2019 1:50:09 PM
Metadata
Fields
Template:
x Address Old
House Number
3020
Street Name
Watertown
Street Type
Road
Address
3020 Watertown Road
Document Type
Septic
PIN
3311823330001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING., INC. Steven B. Schirmers - MPCA Cert.No. 627 <br /> 951 Katydid Lane NE - St. Michael, MN 55376 - (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> December 12, 1999 <br /> Steiner & Koppelman <br /> James R. Renckeng <br /> 3020 Watertown Rd. No. 1/2 <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system is designed for a Type 1, six bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - L+B - LeSueur loam. The seasonally <br /> saturated soils were located at 18" to 26'(mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 26.7 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.