My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02386 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3020 Watertown Rd - 33-118-23-33-0001
>
Septic
>
2000-P02386 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:46 PM
Creation date
7/24/2019 1:50:09 PM
Metadata
Fields
Template:
x Address Old
House Number
3020
Street Name
Watertown
Street Type
Road
Address
3020 Watertown Road
Document Type
Septic
PIN
3311823330001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO SEPTIC SYSTEMPEMMITAPPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N N 55323 J <br /> - R24 ?100 <br /> JOB SITE ADDRESS: oz W q fol K. u..✓ <br /> Occupancy Type: ResidentialL'o, Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> '"Seen fee schedule for non-residential permit fees <br /> Owner's Name: Si�i�rc� .� FC,5a�e --.� Phonel`Tumber: <br /> Mailing Address: o u• /0City: f,✓�z�•4 �p:_S�'9` <br /> Contractor's Name• a 1__,4 PhoneNumber: &/ Z/Z$— 73 -3 <br /> Mailing Address: 2926o City: zip: <br /> DO NOT MAIL PAYMENT NVITH THIS APPLICATION <br /> GEN ERA.LINSTRUCTIONS <br /> 1. _Applications-for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be.mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor- <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D'. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding NTCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.