Laserfiche WebLink
f. t <br /> EXHIBIT E <br /> [DRAINTFIELD COVENANT] <br /> THIS RNMENTUU, is made as of the day of , bN <br /> ("Owners"). <br /> RECIT :: LS: <br /> NXTIEREAS, the Owners are the fee owners of the land leually described as (the "Lot"): <br /> Lot -' Block , CRYSTAL CREEK, according to the <br /> recorded plat thereof, Hennepin County, Minnesota. <br /> WHERE-AS, the City of Orono, Minnesota ("City'=) has required the Owners to sign this <br /> Indenture acknowledging and creating certain covenants against the Lot: <br /> WHEREAS, the Lot has two sewage treatment sites that have been approved by the City. <br /> Tile City has determined that these two sites are the only two feasibl,; sites on the Lot, and must not <br /> be disturbed. As such, tite existing natural topsoil must remain in place and mast not be subject to <br /> Any traffic which Evill cause even the slightest compaction. <br /> NOW, THERFORE, for good and valuable consideration, the receipt and sufficiency of which <br /> is hereby acknowledged, the Owners do intend to subject their Lot to the following covenants: <br /> 1. The Owners acknowledge and agree that the Lot has two sewage treatment sites that <br /> have been approved by the City and the Owners understand that these two sites are the only two <br /> feasible sites on the Lot, and must not be disturbed. <br /> 3. The Owners agree and covenant that the existing natural topsoil on their Lot shall <br /> remain in place and will not be subject to any traffic which will cause even the slightest compaction. <br /> 3. The Owners agree that to protect those important se",age treatment sites from <br /> inadvertent damage or destruction, they SHALL NOT permit an), cars, trucks, or earth moving <br /> equipment to enter upon their Lot or any the Lot of any other owner in the Crystal Creek <br /> development. <br /> A. The Owners SHALL NOT construct any driveway, erect any building, or permit earth <br /> moving equipment on the Lot without first: <br /> A. Erecting a clearly visible fence during construction twenty feet from the <br /> boundary of its sewa`ize treatment sites along that part of the site that is <br /> between the site and all areas which are assessab;e to earth moving equipr_ent; <br /> and <br />