Laserfiche WebLink
Plan Review Checklist for New Structures / Additions <br /> Address/ PID/ Legal: 2..q&5 Wa Wk►V t- W <br /> Description of work: <br /> Septic review by: A— Date Approved: <br /> Zoning review by: 1, Date Approved: l!J '4 • 1--• <br /> Building review by: ��l� <br /> 1� Date Approved: " 12- <br /> Grading review by: 1 V � Date Approved: <br /> Zoning File#: Resolution#: Resolution Date: <br /> Zoninp District Fire Department Post Office School District <br /> Zoning: Lot Area: Z- SF/ Width: Depth: <br /> Survey Submitted: 0 Yes "P—<O Date of Survey: <br /> Proposed Setbacks: <br /> Fron e) Rear et) ( N S E W ( N So W ) Other Buildings Wetland <br /> Side SI <br /> Building Defined Height: Building Peak Height: #of Stories 00: 0 YES <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> START WITH the distance between the basement floor/crawl START the distance between the slab and the highest <br /> space floor and the highest roof peak,t p of WITH roof peak,the top of the cornice of a flat roof, <br /> the cornice of a flat roof,the deck ' of a the deck line of a mansard r the <br /> mansard roof,or the upper point on a round uppermost point on d or other arch-type <br /> or other arch-type roo roof <br /> SUBTRACT half the distance een the highest window and SUBTRACT half t stance between the highest window <br /> highest roof ak of a pitched roof i hest roof peak of a pitched roof <br /> SUBTRACT the distpKe between the basement floor/crawl ADD the distance between the slab and the highest <br /> spaceIloor and the highest existing grade within existing rade within the foundation <br /> the foundation or 10 feet,whichever is less. EQUALS Defined building height <br /> EQUALS Defined building height <br /> Lot Coverage: SF % <br /> Shoreland District MCWD Permit Receive Average Lakeshore Setback Bluff <br /> Yes g 0 Yes No <br /> / 0 Yes E3 No N/A O Yes o <br /> � Permit Number: N/A Setback: <br /> Hardcover Zones Existing Proposed Variance Required... CUP Re uire <br /> 0-75' 0 Yes o 0 Yes No <br /> 75-250' Type(s): Type(s): <br /> 250-500' <br /> 500-1000' <br /> REMARKS (in-house): <br /> Updated: 09/11/2009 <br /> z:\forms\plan review checklist.docx <br />