My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6433
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 6400 - 6499 May 12, 2014 - April 27, 2015
>
Resolution 6433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:50:41 AM
Creation date
7/24/2019 9:50:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution <br /> Exhibit B <br /> Scope of Work at: <br /> 1895 Concordia St. ft <br /> - ,Co <br /> MN 55391 FC��� '� <br /> Owners: 204 <br /> Judy Olausen CI7-V <br /> Brian Sundstrom /)v/VO <br /> General Information: <br /> Survey to be completed by Grondberg on or about 7/16/2014, maps TBD. <br /> I asked Melanie Curtis to discuss the needs of the survey with Grondberg to <br /> help speed the process to take care of the remediation. <br /> Information for stabilizing the soil failure: <br /> Tom Niccum <br /> Timberscape <br /> 1 . Work from Water <br /> A. Bring equipment on shore from lake. A couple of trees may have to be <br /> removed. No material went into the lake; it ended on a large ledge. <br /> B. Move organics from ledge towards the base of the hill. <br /> C. Place boulders as needed in the area where the organic had been. <br /> 2. Work on property from above <br /> A. Place nylon mesh netting from top of property to the organics and boulders <br /> (nonwood or wood type mesh to be determined at time of application to stabilize <br /> hill. <br /> B. Place topsoil over mesh from both lakeshore area and top of hill. <br /> C. Planting types to be determined. <br />
The URL can be used to link to this page
Your browser does not support the video tag.