My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
soil exploration/geoptechinical investigation-2004
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2845 Watertown Road - 04-117-23-21-0003
>
Misc
>
soil exploration/geoptechinical investigation-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:08:23 PM
Creation date
7/24/2019 9:38:16 AM
Metadata
Fields
Template:
x Address Old
House Number
2845
Street Name
Watertown
Street Type
Road
Address
2845 Watertown Rd
Document Type
Misc
PIN
0411723210003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
although other provisions and restrictions may apply. The design maintenancee of temporary <br /> slopes is the responsibility of the contractor. <br /> TABLE C COMPACTION REQUIREMENTS FOR STRUCTURAL FILL AND BACKFILL <br /> _ Relative Density <br /> Standard Proctor Standard Proctor ASTM D4253 <br /> Construction Applications ASTM D698 ASTM D698 ASTM D4254 <br /> -- Cohesive soil Cohesionless soil Cohesionless soil <br /> (lean clay) (sand and gravel) (sand.and gravel) <br /> N (%) N <br /> • Foundations.for buildings and <br /> other structures 95 98 75 <br /> • Roadway sub-grades <br /> • Critical backfill areas <br /> — • Minor surface subsidence is <br /> possible and allowable <br /> _ • Backfill adjacent to structures <br /> not supporting other structures 90 93 45 <br /> • Backfill will not support other <br /> — structures and buildings <br /> • Backfill for pipe or utility <br /> trenches <br /> • Backfill in non-critical areas <br /> where moderate surface 85 88 20 <br /> subsidence is possible and <br /> allowable <br /> Note (A) Use relative density technique (ASTM D4253 and 04254) where Standard Proctor (ASTM D 698) <br /> curve does not have a clear peak at maximum dry soil density and optimum water content. <br /> OVER-EXCAVATION AND STRUCTURAL BACKFILL <br /> Where soil beneath planned bearing grades of foundations and structures, floor slabs, pavement <br /> and structural fill either appears or is likely to be unsuitable and unreliable to support these <br /> features, and over-excavation and structural backfill procedure may be necessary. We <br /> recommend that a Professional Engineer from our company observe, test and review this soil <br /> condition, to determine if the soil must be removed and replaced with structural backfill. We <br /> _ recommend that the Engineer determine depth and lateral extent of over-excavation. The over- <br /> excavation must extend deep enough to completely remove unsuitable and unreliable soil beneath <br /> bearing, grades of these features. Unsuitable and unreliable soil is defined in the second <br /> paragraph in the EXCAVATON AND EARTHWORK section of this report. <br /> Allied Project 04049 12 July27, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.