Laserfiche WebLink
although other provisions and restrictions may apply. The design maintenancee of temporary <br /> slopes is the responsibility of the contractor. <br /> TABLE C COMPACTION REQUIREMENTS FOR STRUCTURAL FILL AND BACKFILL <br /> _ Relative Density <br /> Standard Proctor Standard Proctor ASTM D4253 <br /> Construction Applications ASTM D698 ASTM D698 ASTM D4254 <br /> -- Cohesive soil Cohesionless soil Cohesionless soil <br /> (lean clay) (sand and gravel) (sand.and gravel) <br /> N (%) N <br /> • Foundations.for buildings and <br /> other structures 95 98 75 <br /> • Roadway sub-grades <br /> • Critical backfill areas <br /> — • Minor surface subsidence is <br /> possible and allowable <br /> _ • Backfill adjacent to structures <br /> not supporting other structures 90 93 45 <br /> • Backfill will not support other <br /> — structures and buildings <br /> • Backfill for pipe or utility <br /> trenches <br /> • Backfill in non-critical areas <br /> where moderate surface 85 88 20 <br /> subsidence is possible and <br /> allowable <br /> Note (A) Use relative density technique (ASTM D4253 and 04254) where Standard Proctor (ASTM D 698) <br /> curve does not have a clear peak at maximum dry soil density and optimum water content. <br /> OVER-EXCAVATION AND STRUCTURAL BACKFILL <br /> Where soil beneath planned bearing grades of foundations and structures, floor slabs, pavement <br /> and structural fill either appears or is likely to be unsuitable and unreliable to support these <br /> features, and over-excavation and structural backfill procedure may be necessary. We <br /> recommend that a Professional Engineer from our company observe, test and review this soil <br /> condition, to determine if the soil must be removed and replaced with structural backfill. We <br /> _ recommend that the Engineer determine depth and lateral extent of over-excavation. The over- <br /> excavation must extend deep enough to completely remove unsuitable and unreliable soil beneath <br /> bearing, grades of these features. Unsuitable and unreliable soil is defined in the second <br /> paragraph in the EXCAVATON AND EARTHWORK section of this report. <br /> Allied Project 04049 12 July27, 2004 <br />