My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2019 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2010-2019
>
2019
>
07-08-2019 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 3:38:38 PM
Creation date
7/23/2019 3:38:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,July 8,2019 <br /> 7:00 o'clock p.m. <br /> Litfin stated a number of sponsors help make this event possible, including UnitedHealth Care, Dominos, <br /> Maple Grove Cycling, Bridgewater Bank, and Park Dental, among many others. Litfin stated he <br /> appreciates Orono's support of this event. <br /> The Orono City Council took no formal action on this item. <br /> PLANNING DEPARTMENT REPORT—JOHN THIESSE,REPRESENTATIVE <br /> 13. LA19-000039—BRANDSETTER CARROLL,INC., ON BEHALF OF CAMP TEKO,645 <br /> TONKAWA ROAD, CONDITIONAL USE PERMIT AND VARIANCES <br /> Rick Parker, Brandsetter Carroll; and Rabbi Zimmerman, Temple Israel, were present. <br /> Oakden stated this is a proposed Master Plan for Camp Teko. The applicant is requesting a conditional <br /> use permit to intensify and expand the existing camp use and variances for hardcover and a building in the <br /> 75-foot lakeshore setback, buildings within the 30-foot bluff setback, and a variance from the one-year <br /> deadline for the proposed master plan. Camp Teko has been operating in Orono since 1965 and is located <br /> in the LR-1B zoning district on a 17.96 acre parcel with approximately 1,500 feet of shoreline. <br /> The applicant is requesting the following approvals: <br /> 1. A conditional use permit for intensifying/expanding the existing camp use. <br /> 2. A variance for hardcover and building within the 75-foot lakeshore setback for a replacement <br /> storage shed. <br /> 3. A variance for improvements in the 30-foot bluff setback for proposed new pavilion and two new <br /> program cabins. <br /> 4. A variance from the one-year expiration date to allow for implementation of the Master Plan to <br /> happen in phases beyond four years. If the CUP is in use and the proposed improvements align <br /> with the Master Plan, any variance approvals should be approved with the Master Plan. <br /> Camp Teko has submitted a Master Plan for the camp with multiple improvements. These include a new <br /> program center, program cabins, waterfront improvements, changing rooms, parking, a welcome center, a <br /> maintenance building, entrance monument/gates, cabin renovations, leader lodge, a pavilion, program <br /> platforms,new shelters,restrooms, and a new trail and path network. <br /> The applicant is proposing to implement the Master Plan in phases. Phase one consists of construction of <br /> a program center, program cabins, some trail improvements, and the changing rooms. The applicant is <br /> requesting the necessary approvals to implement the master plan. The goal is to review the proposed <br /> submittals; and if approved,would allow the issuance of building permits in the future provided they <br /> align with the Master Plan. This process would allow for the review and permitting process to be <br /> streamlined and lessen the burden on the applicant. <br /> The proposal meets the required yard setbacks for all new buildings and additions,the wetland setbacks, <br /> and the average lakeshore setback. There is currently a boat house, a storage shed,and part of a cabin <br /> located within the 75-foot lake yard. The new, larger storage shed, however, does not meet the lakeshore <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.