My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-inspection and septic design - no permit on file
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2645 Watertown Road - 04-117-23-12-0008
>
Septic
>
2012-inspection and septic design - no permit on file
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:50 PM
Creation date
7/22/2019 2:17:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2645
Street Name
Watertown
Street Type
Road
Address
2645 Watertown Rd
Document Type
Septic
PIN
0411723120008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet e-�- UNIVERSITY <br /> Minnesota Pollution OF MINNESOTA <br /> Control Agency <br /> Project D: v 11.09.22 <br /> A.Calculate Bed(rock)Volume:Bed length (2.0)X Bed Width .B)X Depth =Volumeft3 <br /> 0 <br /> 63.0 ftX 10. jft x 1.0 = 630.0 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic s: <br /> 630.0 j ft' + 27 = 23.3 yd' <br /> Add 20%for cmutrucWbility: 23.3 yd'X 1.2 = 28.0 jyd3 <br /> B. Calculate Clean Sand Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Media Length =cubic feet <br /> 1.3 ft X 10.0 ft X 63.0 ft = 819.0 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X I I X I ft = <br /> Volume frau Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X I X I ft = <br /> Total Clean Sand Volume:Volume from Length+Volume from Width+Volume Under Media <br /> ft' + ft3 + ft3 ft3 <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height -1)x 3 x Bed Length)+2=cubic feet <br /> ((1 3.0 it -1) X 3.0 ft X 1 63.0 1 )-2- 189.0 ft3 <br /> Downslope Volume:((Downslope Height-1) x Downslope Absorption Width x Media Length)+2=cubic feet <br /> (( 3.6 ft-1) x 10.0 ft x 1 63.0 )+2= 819.0 ft3 <br /> Endslope Volume:(Downslope Mound Height-t)x 3 x Media Width=cubic feet <br /> (I 3.6 ft-I ) X 3.0 ft X 10.0 ft = 78.0 ft3 <br /> Total Clean Sand Volume:Upslope Volume +Downslope Volume +Endslope Volume +Volume Under Media <br /> 189.0 ft' + 1 819.0 1 ft' + 78.0 j ft' + 819.0 lw= 1 1905.0 ft3 <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 1905.0 ft3 27 = 70.6 yd3 <br /> Add 20%for constructability: 70.6 yd3 X 1.2 = 84.7 yd' <br /> C.Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)+2=cubic feet <br /> (1 3.3 0.5 )ft x 1 39.0 ftX 1 85.0 )+2- 4641.0 ft' <br /> Total Mound Volume-Clean Sand volume-Rock Volume-cubic feet <br /> 4641.0 j ft3 - 1905.0 ft' 630.0 ft3 = 2106.0 ft3 <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 2106.0 ft3 + 27 = 78,0 yd3 <br /> Add 20%for constructability: 78.0 yd3 x 1.2 = 93.6 yd' <br /> D.Calculate Topsoil Material Volume:Total Mound Width X Total Mound Length X.5 ft <br /> 39.0 ft X 85.0 ft X 0.5 ft = 1657.5 ft3 <br /> Divide ft'by 27 ft'/yd3 to calculate cubic yards: 1657.5 ft' + 27 = 61.4 yd3 <br /> Add 20%for constructability: 61.4 yd3 x 1.2 - 73.7 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.