My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-inspection and septic design - no permit on file
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2645 Watertown Road - 04-117-23-12-0008
>
Septic
>
2012-inspection and septic design - no permit on file
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:50 PM
Creation date
7/22/2019 2:17:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2645
Street Name
Watertown
Street Type
Road
Address
2645 Watertown Rd
Document Type
Septic
PIN
0411723120008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING <br /> Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.B)X Mound Absorption Ratio (1.F)-Absorption Width <br /> 10.0 lit x 2.0 = 20.0 it <br /> B. For slopes>1%,the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorption Width (3.A)-Bed Width (2.6)=ft <br /> 20.0 lit - 10.0 ft 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate Clean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=Clean Sand Lift (1 ft minimum) <br /> 3.0 ft - 2.0 ft = 1.0 ft Design Sand Lift(optional): -�1.0 <br /> B. Calculate Upslope Height:Clean Sand Lift (4.A)+media depth (1 ft.)+cover (1 ft.)=Upslope Height <br /> 1.0 ft + 1.0 ft + 1.0 ft= 3.0 ft <br /> D•34:Slope Multlplier Table <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 I I 12 13 14 15t35LO209 <br /> 19 20 21 11 23 24 25 <br /> Upslope 3:1 3,00 2.91 2.83 2.75 2.68 2.61 2.54 2.4812.4212.3612-31 2.26 1.21 2.17 2.13 E2499WZ <br /> 1.97 1.95 1.93 1.91 1.89 1.87 1.85 <br /> Berm Ratio 4:14.00 3.85 3.10 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.10 2.62 1.55 2.23 2.18 2.ti 2.08 2.03 1.y8 1.93 <br /> Ladd Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 I2 23 24 25 <br /> DOvmSlOpe 3:1 3.0C 3.09 3.1913-3013.4113.51 3.66 3-8013-9514,1114114.4814.6914,9515.24 5.55 5.88 6.24 6.63 7.04 7.47 7.93 8.42 8.93 9.46 10.02 <br /> Bem3 Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.%15.016.2516,67 7.1417.6918-2918.12 9.51 10.24110.94111-67112.42 13.19 13.99 114.82 15.61 116.54 117.44 <br /> Select Upslope Berm Multiplier <br /> C. (based on land slope): 1 3.23 (figure D-34) <br /> D. Calculate Upslope Berm Width:Multiplier (4.C)X Upslope Mound Height (4.6)=Upslope Berm Width <br /> 3.23 ft X 3.0 ft = 10.0 ft <br /> E. Calculate Drop in Elevation Under Bed:Bed Width (2.8) X Land Slope (1.D)=100=Drop (ft) <br /> 10.0 ft x 6.0 % f 100= 0.60 ft <br /> F. Calculate Downslope Mound Height:Upslope Height (4.6)+Drop in Elevation (4.E)=Downslope Height <br /> 3.0 ft + 0.60 ft = 3.6 ft <br /> G.Select Downslope Berm Multiplier <br /> (based on land slope): 5.26 (figure D-34) <br /> H.Calculate Downslope Berm Width:Multiplier (4.G)X Downslope Height (4.F)=Downslope Berm Width <br /> 5.26 1 x 3.6 ft = 19.0 ft <br /> 1. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.B or 3.C)+4 ft.=ft <br /> 10.0 ft + ft = 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 19.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)-Endslope Berm Width <br /> 3.00 ft x 3.6 ft = 11.0 ft <br /> M.Calculate Mound Width:Upslope Berm Width(4.D)+Bed Width (2.B)+Downslope Berm Width (4.J)=ft <br /> 10.0 1 ft + 10.0 ft + 19.0 ft = 39.0 ft <br /> N. Calculate Mound Length:Endslope Berm Width (4.L)+Bed Length (2.C)+Endslope Berm Width (4.L)-ft <br /> 11.0 ft + 63.0 ft + F 1-1-.0--1 ft = 85.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.