My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including 2002 design
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2590 Watertown Road - 33-118-23-44-0042
>
Septic
>
septic info including 2002 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:22 PM
Creation date
7/22/2019 9:08:26 AM
Metadata
Fields
Template:
x Address Old
House Number
2590
Street Name
Watertown
Street Type
Road
Address
2590 Watertown Road
Document Type
Septic
PIN
3311823440042
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLW SFi.RC' ON PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Petforation Discharges in GPM <br /> Head Perforation diameter <br /> Pressure Distibution fen inches <br /> 3.a. Select number of perforated laterals 3 7/32 1/4 <br /> b. Select perforation spacing= feet. 1.0a 0.56' 0.74 <br /> C. Subtract 2 ft.from the rock layer length. a 0. 0.90 <br /> (,a- -2 ft.= kc) feet. lob o.80 1.04 <br /> Red loyff ria, <br /> d. Determine the number of spaces between perforations. a Use 1.0 foot single homes. <br /> Length perf.spacing= C-o ft.+ I_ft.= ao spaces b Use 2.0 feet for anything elsw <br /> e. aO spaces+1 =�_perforations/lateral <br /> f. Multiply perforations per lateral by number of laterals to I N <br /> et total number of perforations. > & x a = L Z perforations. <br /> g. x =�'L gpm. <br /> SELECTED PUMP CAPACITY . H 7 gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Soil°"W''""y"m <br /> required at manifold if gravity s stem,zero. <br /> _feet qp.>e'r'` <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Dee em <br /> Read friction loss in feet per 100 feet from table(F-14). ape ...._.. _ <br /> F.L.= 3 ..15' ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge .................................... <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length-1.25 times pipe length= <br /> SS x 1.25=.�_feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying Nominal <br /> friction loss in ft/100 ft by equivalent pipe length. pipe dia. <br /> Total friction loss= 3 • L_x--k2--1-100=_ R feet Flow Rate 1.5" 2" 3" <br /> 4. Total head required is the sum of elevation difference, gpm <br /> special head requirements,and total friction loss. <br /> 20 2.47 0.73 0.11 <br /> .e" +Z_ 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> TOTAL HEAD feet 45 2.64 0.39 <br /> �_ 45 1 111..007 3.28_ 0.48 <br /> 50 13.46 -:9� 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> 770 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> �,_gpm (Step A)with at least 12' feet of total hemi (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.