My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00672 - mechanical
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Rd
>
2380 Watertown Rd - 34-118-23-33-0080
>
Permits/Inspections
>
2015-00672 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:29 PM
Creation date
7/17/2019 12:09:55 PM
Metadata
Fields
Template:
Address
House Number
2380
Street Name
Watertown
Street Type
Road
Address
2380 Watertown Road
Document Type
Permits/Inspections
PIN
3411823330080
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/27/2015 10:29 6127246656 TEAMMECHANICALINC PAGE 02 <br /> City of Orono <br /> P.O.Box 66 <br /> 2.750 Kelley Parkway <br /> Crystal bay,MN 55323 <br /> Phone(952)249.4600 Fax(952)2494616 <br /> ..... o��.. CITY OF ORONO—MECHANICAL PERMIT <br /> (All Commercial permits trust be approved by the Building Official or lrispeator and/or Fire Marshall) <br /> 1. You may apply far mechanical permits by mail or in person at the City offices. Applications will <br /> be reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT <br /> VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN OTIL THE <br /> PERMIT CARD IS POSTER ON THE JOB SITE. <br /> 3, Mechanical DesilMs—Complete calculations,details and specifications are required for each <br /> heating,ventilation,hutnidifieation-dehumidification,and air conditioning installation including <br /> heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to <br /> type,manufacturer and model_ Data shall be presented on form provided. <br /> 4. When any new construction or remodeling is involved,a separate building permit must be <br /> obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work trust be inspected(rough-in and final). Call(952)249-4600. <br /> (24-48 hour notice required) <br /> 7. House Heating Test Record must be submitted before final. <br /> 11 gall IIII:IM <br /> Y , <br /> esidential ❑Commercial(Approval Required) <br /> ❑New ❑Additional ❑Repairs p ace <br /> Lim _ i u d' <br /> Site Address: z5UW ��/�''jWiZ <br /> owner-7;/,4 4,r)7/t- Mailing Address: 3 4T�r7Ix�6+� <br /> City: 2120 Ak Zip: <br /> Home Phone: 55A-W,9- __ Alternate Phone: <br /> Contractor: -.Zit? 4d441nal Contact Person: / U4ulI <br /> Address: C? State Bond#: /17u071�. <br /> City: h Zip: Expiration Date: J6/49P <br /> Phone: (A '7;j'-5 V16 Alternate Phone: <br /> insurance—Current: 'S <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.