Laserfiche WebLink
CITY OF ORONO <br /> I IC SYSTEM APPROVAL <br /> tl � ot <br /> '{.+tT.try Vim' <br /> ClqPv <br /> ,b <br /> 400 _A <br /> of 0110NO <br /> Mtuilelpal Mcm <br /> a Y <br /> Post Ortke Box GG <br /> Crystal Bay,MinumAn 55323-0066 <br /> LOCATION: 2325 Watertown Rd. <br /> OWNER: Kelley & Kelley Nursery <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S—P Testing REPORT DATE: June 30, 1994 <br /> The City of Orono has Approved your on-site system design as of July 19, 1994 <br /> (approved-disapproved) (date) <br /> with the following comments: The sewage line to the tanks may need to be rerouted <br /> to maintain a 20 ' setback from the well . <br /> THIS IS NOTA PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INS'IALLER.S: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUS'I BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render thele <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORON0 <br /> Y <br /> Stephen V eckman, On-site Systems Nlanager <br /> TELEPIIONL'-473-7357 9 PAX-473-0510 <br />