Laserfiche WebLink
Total Exposed Roof/Ceiling Area <br /> j. Total skylight area . <br /> k . Total flat roof/ceiling framing area --- <br /> 1. Total net inslted flat roof/ceiling area 1 Q_--- <br /> m. Total vault roof/ceiling g framin area-10% <br /> _ ... <br /> n. Total net inslted vault roof/ceiling area —� <br /> Determine "U" value for each roof/ceiling segment. <br /> ' X "U" G <br /> k. _ <br /> D _ X "U" ___ mei <br /> 5. TOTAL - -------- <br /> L aNtAp-2 <br /> If item 15 is the same as, or less than item 12, you have met the <br /> intent of SBC 6006 (c) 1. <br /> Total Exposed Floor/Cant. Areas <br /> o. Total floor/cant. framing area (avrg. 10%) _ / <br /> p. Total net insulated loor/cant. area -_!Y_Q------ <br /> Determine "U" value for each floor/cant. segment. , <br /> 6. TOTAL = ------------ <br /> �.— <br /> If total of 16 is the same as, or less than ,3_, you have met the <br /> intent of SBC 6006 (c) 3_ <br /> ALTERNATE BUILDING ENVELOPE DESIGN <br /> To utilize the total envelope system method, the values established <br /> by the sum of items 14, 15 and 16 shall not be greater than the sum <br /> of items 11 , 12. and 13. <br /> Prepared Byle <br /> Da to <br /> i <br />