Laserfiche WebLink
v <br /> �4 <br /> CITY OF ORONO Permit # <br /> SEPTIC SYSTEM PROVAL Fee $ <br /> Entered By <br /> The General Contractor will be given a copy of this report and is <br /> responsible for its distribution to all sub-contractors. SEPTIC SYSTEM <br /> DESIGN IS NOT /C�O/NSIDDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED. <br /> LOCATION: <br /> GENERALCONTRACTOR: gY�c` T�1�15' '\ L py)4 : PHONE: <br /> SEPTIC CONTRACTOR: PHONE: <br /> OWNER: 9 L � PHONE: <br /> FJ APPROVED <br /> 9 CONDITIONALLY APPROVED: (Note Changes Below) <br /> COMMENTS: <br /> 01- J' f _ � 1 <br /> -14/ 1,�1 Wi.._. r.'. !•��'^'v' _ i /� <br /> / 1 <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior <br /> approval of the Inspector (473-7357). Call for inspections 24 hours in advance. <br /> NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br /> prior to and after system installation to avoid compaction of the naturalsoil. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must <br /> remain in place until final site grading. Approval to pour footings will not be granted <br /> until the Inspections Department has verified that primary and alternate sites are <br /> adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY RIND (cars, trucks, earth moving equipment, etc.) is allowed <br /> within 20' of tested drainfield sites either before or after system construction. This <br /> applies to the lot you are working on and all adjacent lots. You could be held liable for <br /> damaging sites on neighboring lots. <br /> VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE. <br /> Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br /> Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br /> F,RtE O F-F �RATN F-Ta� .5.rT� -s 9F:F0PEb1C&rAr-,. <br /> 1 <br /> Date Approved By fCity of Orono <br />