My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
07-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2019 10:18:35 AM
Creation date
7/16/2019 10:03:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4B. Sanitary Sewer Plan <br /> Conditions <br /> Expansion of the MUSA on the established prioritized basis noted above will occur only when one <br /> of the following conditions is found: <br /> 1. When an area of existing homes has failing or non-conforming septic systems and <br /> replacement drain field sites are not available for a significant share of the existing homes. <br /> 2. When an individual home has a failing or non-conforming septic system, does not have an <br /> alternate drain field site, is adjacent to existing sewer lines, and is not part of a <br /> neighborhood that could be better served by a neighborhood sewer lateral project. <br /> 3. When a new or existing residential development meeting all required development <br /> standards is adjacent to existing sewer lines and the developer or homeowners agree to bear <br /> all costs of extending municipal sewer to the development,but only when inclusion of such <br /> development in the MUSA will not result in a decrease in the City's sewered density as <br /> calculated by the Metropolitan Council. <br /> Future Sanitary Sewer Improvements <br /> The City's focus on future sanitary sewer needs will be on a limited number of extensions to <br /> service new developments within the existing urban area/ MUSA and maintenance to include I&I <br /> mitigation of the existing system. <br /> Future Sewer Expansion Projects <br /> Table 4B-13 below lists possible future sewer expansion projects. Project #4 listed below may <br /> include a new connection to a MCES collector. <br /> Table 4B-13:Projects <br /> Improvement Projected <br /> Year of Triggering <br /> Completion Event <br /> Orono Preserve Development-Sewer main to <br /> 1 serve 39 new homes 2018 Subdivision <br /> Shadywood Villas Development-Sewer main to <br /> 2 serve 7 single family homes 2018 Subdivision <br /> Brackets Point Sewer Main replacement- <br /> Replacement of existing gravity main with a <br /> 3 forcemain and lift station,away from the lake 2018 Subdivision <br /> CSAH 112 Sewer Main Extension - Extension of <br /> sewer main west along CSAH 112 from Old Crystal <br /> Bay Road to serve future developments planned on CSAH <br /> 4 the south side of CSAH 112. 2019 turnback <br /> 5 Wildhurst 2019 Subdivision <br /> City of Orono Community Management Plan 2020-2040 Part 4B, Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.