My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010198 - new septic system
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
430 Wakefield Road - 36-118-23-24-0003
>
Septic
>
1998-010198 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:15 PM
Creation date
7/12/2019 10:04:09 AM
Metadata
Fields
Template:
x Address Old
House Number
430
Street Name
Wakefield
Street Type
Road
Address
430 Wakefield Road
Document Type
Septic
PIN
3611823240003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr-06-98 07:06A William Henderson 612 404 2299 P. O6 <br /> F17 <br /> Gb PDPOIUTMN CP A PEAPORATM LATMAL <br /> A Dehrailne pump capadty: •�•• <br /> Gravity Distdbution *•..•� <br /> 1. Mirdmum suggmtad is 600 gallons per hour 00 Spm)to stay ahead Of <br /> water use sage. tr.w."w. `. wr. W......�+ <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 I MM ion <br /> gallants par hour(46 gpm)to prevent build-up of pressure in drop box. L 64V <br /> Pressure Distibution elm sow w• <br /> 3,a. Select number of perforated laterals <br /> b. Select perforation spacing: z het. .° `►. .w""'""..�"""' <br /> C. Subtract 2 ft from the rod;layer length. <br /> ,mrozzw2 ft.s< feet <br /> d. betirrraw the oumber of spaces between perforations. <br /> Length Pte•spacing= - ft.+ -... ft._ .... spaces > rufmmn Dtset>=x. <br /> e. spaces+1= -^pe darationaSt-wal "'ValJow 1wznwk=wa i <br /> f. Multiply perforatiotns per lateral by number Of laterals tO fi Moro i ram <br /> get total number of perforations. perforations. (1"0 <br /> 1.0a 0.56 0.74 <br /> SM EC'TM PUMP CAPACrrY C" gpm M". 2.Ob 0.80 1.04 <br /> D.Determine head requixvementm a.Use far single family homes <br /> 1. Elevation difhrencebetween pump and point of discharge. b.Use for all other applications <br /> I -feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if grsvity system,zero. <br /> feet <br /> 3. Friction lose <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe 1,mgth <br /> Read friction loss in feet per 100 feet from table. Point of Dischng <br /> F.l...=,rift./100 ftof pipe ns.4D <br /> b. Detcm*w total pipe length frorn pump to discharge Etcwadat Dif ommm <br /> point. Add 25 percent to pipe length for fitting <br /> loss,or use a fitting lose chart. Equivalent pipe <br /> length'125 tires pipe length- F-1$b <br /> x 125- 5 to ,feet <br /> C. Calculate total ftOri lass tty multiplying 1 5 inch 2.0 inch 3.0 inch <br /> FrSdim Id Pw 1001t of pipe <br /> friction loss in ft/100 k by equivalent pipe length. <br /> Total friction loss. 3, *�•x oto +100= �feet r2 C;96 0,28 <br /> 4. Total head required is the sum of elevation difference, 14 1.29 0.39 <br /> Special head requirenunts,and total friction loss. 16 1.63 0.48 <br /> 19 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> 1 + + 25 3.73 1.11 0.16 <br /> (1) (2) (36 30 5.23 1.S5 0.23 <br /> 3S 7.40 2.06 0.30 <br /> 40 11.07 2.64 0.34 <br /> TOTAL EMAD ',t L4 feet .45 14.73 3.28 0.48 <br /> s0 3.99 0-58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> gym (Step A)with at least L4L_feet of total head(Step 8). <br /> Y"t-rK. <br />
The URL can be used to link to this page
Your browser does not support the video tag.