Laserfiche WebLink
o <br /> r �&=4 CITY of ORONO ' <br /> to ��j��.� �. �► <br /> Nfunicipal Offices <br /> Street address: Mailing Addresso 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> 95d-Ati-4600 <br /> To Current Owner: Address. 37s- 'VVC k( <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): <br /> 1 "CODE SYSTEM"An ISIS which meets all the location,design and construction standards of the current Orono Municipal Code. <br /> "COMPLIANT SYSTEM" An ISTS which does not meet all the location,design and construction standards of the current Orono Municipal <br /> Code but does meet the three foot separation requirement or two foot requirement for systems installed 1996 or earlier,and which is not failing or <br /> _an imminent threat to public health or safety. <br /> 3 "NON-COMPLIANT SYSTEM" A prohibited ISIS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> or may not meet all the location.design,or construction standards of the current Orono Municipal Code and which is failing for any reason;and <br /> any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting soil characteristics. <br /> TANK CONDITION <br /> Tank inspection indicates: <br /> 5 Pumpout not needed at this time. <br /> 6 Septic tanks must be pumped out this year (city code requires tanks to be pumped out once every 3 years. <br /> Tank was last pumped SC-31-o D 1. <br /> Make sure septic tanks are pumped through manhole and not through white inspection pipes <br /> This allows for the proper cleaning. <br /> 7 Inspection risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be installed in each tank. <br /> RAINFIELD CONDITION -10): <br /> 8 Drainfield is dry,no surfacing evident. <br /> 9 Some evidence of surfacing,not critical yet. r <br /> 10 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br /> immediately.Repairs must be completed within 90 days. <br /> CONSIENTS: Qc�;^��\v <br /> Date of Inspection Matt Bolterman- Septic System Inspector <br /> Note: In the event that this inspection report Is used to satisfy the requirements for a mortgage or other transfer ofproperty.be advised that this report does not guarZntc <br /> or certify that an existing system will continue to function properly,but is merely an opinion ofthe adequacy ofthe system under current conditions based on the availabl <br /> information. <br />