Laserfiche WebLink
CITY OF ORONO SEPTIC SYSTEM PER!Wr APPLICATION <br /> Boz 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> JOB SITE ADDRESS <br /> �d W�1< <br /> Occupancy Type: Residential X Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> Repair Existing System $ 50.00 ✓' <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name: �a�%n o., ��5� c ee , Phone Number: <br /> Mailing Address: City:O Jr,-©. Zip: <br /> Contractor's Name: Phone Number _9G3 9 72-9-q2-0- <br /> MailingAddress: 5 2 4ap o e. /a uc• �_ city:UU.P n o. Zip: -5'T-728 . <br /> *** DO NOT MAIL PAYMENT WITH THIS APPLICATION* <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval' cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installers License shall be present during all inspections. A24-hour <br /> notice is required for all inspections. <br />