Laserfiche WebLink
t <br /> 5. SPECIAL INSTALLATION PROCEDURES <br /> SPECIAL INSTALLATION PROCEDURES No. 6 <br /> TRIMLESS RAKE DETAIL <br /> APPLY A BEAD OF SEALANT(1 PART URETHANE <br /> NON ACIDIC)ON TOP OF THE GERARD DRIP-EDGE <br /> METAL RUNNING DOWN THE RAKE AND ACROSS <br /> OTHE TTOM AS SHOWN. <br /> (2'X 2"GERARD <br /> PANEL BATTEN (1"X 4"COUNTER BATTEN <br /> 0 <br /> (1 X 4"COUNTER BA <br /> ; <br /> 1'X 2"OR 312"X 3/4" e <br /> GERARD DRIP-EDGE FAS EVERY 24". <br /> METAL(PAINTED GLOSS a SCR /RUBBER <br /> WHITE BROWN OR <br /> GRAY) e W ER OR 8p GAL <br /> WITH SEALANT <br /> EXISTING SPACED RAKE RAFTER SEAT NEW GERARD <br /> SHEATHING SHIP LAP GERARD ST O E TRIMLESS RAKE <br /> STARTER-BOARDS (1"X 2"TRIMLESS COATED FASCIA METAL METAL DOWN ONTO <br /> RAKE BATTEN (31/2 OR 5-FACE) SEALANT BEAD TO <br /> 2"GERARD DRIP EDGE METAL THIS PROVIDE A <br /> METAL MUST JUST COME PAST OR WEATHERTIGHT SEAL <br /> MEET DIRECTLY AT THE FASCIA. <br /> GERARD TRIMLESS <br /> RAKE METAL TONE- <br /> COATED TO TCH <br /> THE GERARD ROOF <br /> COLOR) <br /> NOTCH THE GERARD FASCIA METAL <br /> TO ALLOW THE GERARD TRIMLESS <br /> (1'X 2'OR(3/4"X 3121 RAKE METALTO EXIT.(SEAL AS <br /> GERARD DRIP-EDGE METAL NECESSARY) <br /> © SEALANT <br /> .��':%, iii ��;:�'.• <br /> RAKE GABLE TO HIP INTERSECTION <br /> 10V <br /> GERARD TRIMLESS RAKE METALTO EXIT OUT ONTO <br /> SURFACE OF THE FIRST GERARD PANEL <br /> \�; ��\`♦. BELOW THE H RAKE INTERSECTION AS SHOWN <br /> GERARD PANEL(TILE OR <br /> SHAKE)SHOWN CUT&BENTS:� ♦ . CUT&BEND THE GERARD HIP CAP <br /> ' ♦�., TO FIT DOWN INTO THE GERARD <br /> DOWN INTO THE GERARD Z.\` TRIMLESS RAKE METAL(SEAL AS <br /> TRI MLESS RAKE METAL. e. <br /> ♦ �., NECESSARY) <br /> SPECIAL NOTE: \♦ \ ♦♦ ♦\ . �����\ ♦ .�\ <br /> .�♦ <br /> Illustrations shown depict the Gerard . <br /> Trimless Rake Metal installed over existing <br /> spaced sheathing after removal of the <br /> existing wood shake/shingle roof. <br /> When roofing directly over the existing <br /> wood shake or shingle roof,the following <br /> materials are to be used: <br /> A. Gerard 3 1/2"Drip-Edge Metal(Instead <br /> of the standard 2". <br /> B. Gerard 5"Stone Coated Fascia Metal <br /> (Instead of 3 1/2") <br /> C. All other metals in drawings 1-4 are <br /> the same. <br /> 0 Gerard Roofing Technologies,2001-03-01 Page 61 GERARD' <br />