My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-1998 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1998
>
03-16-1998 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:50:41 PM
Creation date
7/10/2019 2:50:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br /> MEETING HELD ON MARCH 16. 1998 <br /> • (##4) #22.92 Tom Okerstrom - Continued) <br /> The size of the garage was discussed. A two-car garage was satisfactory, but Berg <br /> questioned the need for the second story. Stoddard indicated that a reduction in footprint <br /> would also reduce the mass of the garage. Bressler indicated a 22'x24' garage would <br /> reduce the coverage by 120 s.f. to 18%. The proposal was at 18.4%. With the shed <br /> removal, the structural coverage would be at 17.5%. <br /> Stoddard moved to approve Application#2292 per Staff recommendations subject to a <br /> footprint limited to 22x24' or 528 s.f The dormer would be allowed as well as heating but <br /> no plumbing. Motion failed for lack of a second. <br /> Stoddard begun to make a motion to delete the second floor but Okerstrom questioned it. <br /> Stoddard moved, Berg seconded, to approve Application#2292 for a 22'x24'garage with <br /> an 8' first story and a 10:12 pitch, without dormer, per Staff recommendations. A space <br /> heater will be allowed. Vote: Ayes 4, Nays 0. <br /> NEW BUSINESS: PUBLIC HEARINGS <br /> (#6)#2343 TIMOTHY AND BONNIE JOHNSON, 627 I ERNDALE ROAD <br /> • NORTH- VARIANCES - 9:41-9:50 P.M. <br /> The Certificate of Mailing and Affidavit of Publication were noted. <br /> The Applicants were represented by contractor, Pat Hanley. <br /> Bressler distributed pictures of the property. The proposal is for construction of a <br /> detached garage with dormer located near the front lot line. Variances are required for <br /> locating the structure in front of the principal structure and for side yard setback. Bressler <br /> explained that it would be difficult to locate the accessory structure to meet the side <br /> setback if it is to follow the line of the house and tie in with the loop driveway. The <br /> concern is with the location encroaching into the 10'utility easement. He noted that the <br /> garage doors will not be visible from the street and will present the look of a small <br /> cottage. The dormer will not be used for living space and no heating or plumbing is <br /> included. Bressler recommended approval for the accessory structure located 227' from <br /> the front lot line with principal structure located 329' from the front lot line, but <br /> recommended denial of the 5' side setback variance. <br /> Hanley indicated that they attempted to place the structure to the side of the house but <br /> were unable to obtain the proper turn into the garage. The other side of the property is a <br /> walk-out. There is an attached two-car garage on the property and the proposed structure <br /> would be used for storage purposes. <br /> • <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.