My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-1998 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1998
>
03-16-1998 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:50:41 PM
Creation date
7/10/2019 2:50:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br /> MEETING HELD ON MARCH 16, 1998 <br /> • <br /> (#5) #2350 Kevin and Lisa Olsen/Jim and June Touve- Continued) <br /> Touve asked if the Commission could mandate Staff to work with them. He indicated it is <br /> difficult to work with the other agencies prior to City approval. Berg informed Touve that <br /> the process called for the other agencies review before City action can be taken. Smith <br /> said the City would help him work through the process. Gaffron said an application <br /> would be required for building on lots 58-61 and advised that this be a separate <br /> application. Stoddard reiterated that the DNR protected wetlands required approval from <br /> the entities noted prior to review by City. He suggested this be done now or an easement <br /> would be required and the lot could not be sold. <br /> Stoddard moved to table Application#2350. Olsen asked that the Commission act on the <br /> application at this time. <br /> Stoddard moved, Berg seconded, to recommend denial of Application#2350. Vote: <br /> Ayes 4, Nays 0. <br /> CONTINUATION OF PUBLIC HEARINGS <br /> (#3) #2335 LAWRENCE MOLSATHER AND LINDA SALLEE, 3285 CARMEN <br /> ROAD - VARIANCES - 8:49-8:56 P.M. <br /> • The Applicants were present. <br /> Bressler distributed photographs of the property. The applicant proposes to rebuild and <br /> expand an upper level deck located on the lakeside of the property requiring variances for <br /> structural coverage, hardcover within the 0-75' lakeshore setback, average lakeshore <br /> setback, and lakeshore setback. The Planning Commission was previously concerned with <br /> the hardcover in the 0-75' setback and asked to submit revised plans limiting the increase <br /> to 1-2%, which would still enable the applicant to have a more functional deck. A new <br /> plan was submitted. The original plan showed the deck extending 6'7" beyond the <br /> overhang. The extension is the same in the new plan but in a smaller area. The remainder <br /> extends 2-1/2' beyond the overhang. Gravel was reported to be located under the deck <br /> and by the lakeshore, which Staff had been previously unaware of and hardcover <br /> calculations were redone to reflect this. <br /> Bressler reviewed the issues 1-6 as noted in the memo and reviewed the recommendation <br /> for approval. <br /> Molsather and Sallee were in agreement with Staffs recommendation. <br /> Mabusth asked if the hardcover calculations included the stairway and 25 s.f. of pavers. <br /> • Bressler said the calculations include all hardcover after removal of plastic. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.