My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-1997 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1997
>
11-17-1997 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:38:39 PM
Creation date
7/10/2019 2:38:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON NOVEMBER 17, 1997 <br />( #4 - #2308 Brook Park Realty - Continued) <br />The revised plan includes construction of 30 townhomes on 9.93 acre site with access <br />from Livingston Avenue. The units are connected with four per building. The northerly <br />units will be served by a road. The southern units will be served by a driveway. The <br />Mound Fire Department would like to see the 6" water main looped, which will increase <br />the unit cost by $1.50 -$2.00 per square foot, or the units sprinkled. The 22' road width <br />was recommended by the landscape architect in order to maintain trees. The City <br />Engineer has agreed to that width, while noting it does not meet City standards. The <br />issue involved is fire safety versus saving trees. <br />The City Engineer supports the sanitary sewer and water design, which conflicts with the <br />opinion of the fire department. Details will be required for final plan. City Engineer <br />Kellogg recommended Livingston Avenue be extended to the west and sanitary and water <br />main stubs be extended as well. The drainage area map was thought to show high <br />calculations at 20 minute concentration and recommendation is made for a maximum <br />time of concentration of 15 minutes. Pipe grading or sizes may need to be revised. A <br />paved swale or erosion control should be provided downstream from the piping. Details <br />of the pond outlet control and weir should be provided for review. The timber weir may <br />present a future maintenance problem and an alternate outlet structure may be desired. <br />The 19 units served by temporary cul -de -sac exceeds the maximum of 10 allowed. Van <br />Zomeren noted there is no history in Orono of similar townhouse development and <br />questioned whether this should be maintained or changed. Livingston Avenue design is <br />not built to a 30 mph speed and the radius should be increased to 275 ft. or reduced speed <br />warning signs installed, which Staff recommends. The City Engineer also asks that a <br />typical street section be provided to verify the proposed pavement design. <br />Van Zomeren said the landscape consultant has indicated that the revised plan is an <br />improvement and noted the identification has been provided for the larger stands of trees. <br />The preservation level of trees is at about 50 %. <br />Van Zomeren said it was her opinion that the application be tabled to the January meeting <br />in order for review of fire department and engineering recommendations. Since there is a <br />two month span of time, Van Zomeren said a recommendation could be made by the <br />Planning Commission based on the comments received by the City Engineer and <br />landscape consultant. <br />Mr. Gleason said he received a letter dated November 13 from the landscape architect. <br />Van Zomeren reported that she had not received it. A copy was given to Van Zomeren <br />for her immediate review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.