My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-1997 Planning Commission Minutes
Orono
>
Planning Commission
>
1997
>
08-18-1997 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:34:06 PM
Creation date
7/10/2019 2:34:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�J <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON AUGUST ST 1 R_ 1907 <br />(#12 - #2281 Hennepin County - Continued) <br />Leonard Berg questioned whether he was notified. Schroeder informed him that people <br />within a certain radius of the nronosed activity is notified. Bern said he found out about <br />land being taken in December and decisions were already made by that time. Lindquist <br />infeirmPd him and nthe.rc to rnntart the. rnt inril if them have me oinnc <br />Lindquist asked what is to be accomplished at this meeting. Gaffron said issues pertaining <br />to wetlandC are.. rele.vant- be noted the.. nubltr nnegtinnr revardtri4 imnAet on gentir. CvRtefmq <br />wells and well water, stormwater concerns and where drainage is directed. Gaffron said <br />he feels these issues have been addressed in the information given by the agencies. Theis <br />was asked to address these certain questions. <br />Theis said an application is before the MCWD as far as stormwater is ,concerned. This <br />wnvild n4o to water nimlity mui emrmwate.r ralretlatinne and analvek arcs inr1111A l and <br />information available. As far as septic systems are concerned, Theis said they must be <br />operational. If impacted, the Countv will make the corrections per Citv code. Regarding <br />the pond, the only place impacted is in the wetland. He said he would check on this. <br />Gaffron noted the intention of having the Citv Engineer review the stormwater plan is to <br />review the details. He indicated water level should not change and flowage will be <br />rherked for the. nond area <br />• Hawn asked if the Pe ro rty owners should be identifying septic systems on the properties <br />P <br />or wait to hear from the r'oiinty Theis resnondeti that if the nronerty owners would like <br />an additional level of comfort, the mound systems can be surveyed. This is normally <br />performed as part of the real estate negotiations but can be done now as the systems must <br />meet City code. <br />• <br />Theis said there will only be filling of .8 acre of wetlands and only shallow wells would be <br />affected. Gaffron said there are likely no shallow wells. <br />Cornelius noted that he is unaware of where the drainage flows. <br />Gaffron said the wells are typically 100 -I SY deep. Wetlands provide for some recharging <br />but the 1/2 acre in the scheme will not impact or change the surface or around water. <br />Gaffron said he sees no impact on the wells or the ground water. <br />Lindquist asked if there were any other questions to be answered. <br />Brown asked if the County was directed by the City regarding realignment of the road. <br />Theis said thev were. Theis said the wetlands are affected by the widening of the road and <br />affected on both sides. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.