My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-1997 Planning Commission Minutes
Orono
>
Planning Commission
>
1997
>
06-21-1997 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:32:47 PM
Creation date
7/10/2019 2:32:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C� <br />ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JULY 219 1997 <br />( #13 - #2264 Janet C. Kiernan - Continued) <br />new construction. Gaffron said it is questionable whether the use of current footings would <br />allow "grandfathering" of the current setback. Lindquist said the use of the current foundation <br />would have to be clarified. Gaffron said from the staff standpoint, the application as presented is <br />viewed as new construction. <br />Hawn asked if the applicant considered a plan which would move the house back on the <br />property. Kiernan reviewed her plans noting the designer, contractor, and inspector felt it would <br />be more expensive to mesh old plans with new. Kiernan said she had not considered moving the <br />house back. She indicated that it would incur more expense to have another plan drawn and she <br />would prefer not to. Schroeder said it would not necessarily involve a totally new plan. <br />Lindquist was informed that all of the existing structure would be removed except for the <br />foundation. Lindquist said he would recommend that all structure be located behind the 75' <br />setback. <br />Kiernan asked if a 30' side setback would be considered a problem. Lindquist said it was not <br />from his perspective. He was informed that the existing side setback is 14.5'. Hawn noted that <br />the property is very well screened. Schroeder noted there were trees located on the other side. <br />Lindquist noted the small size of the lot for the zoning district. He asked if the property is going <br />to be sewered. Gaffron said it is the City's intent to do so as soon as all property owners involved <br />are on board. It has been determined that the cost of the sewer project is more than earlier <br />anticipated. <br />Hawn inquired about hardcover calculations. Gaffron said they have not been included. He <br />noted that the property was allowed 27.6% in the 75 -250' setback and 2.9% in the 0 -75' setback, <br />and the applicant intends to meet those requirements. Kiernan said she thought the current plan <br />proposes less than that amount. <br />Lindquist said he would recommend all hardcover be behind the 75' setback. Schroeder said the <br />issue is the prior approval allowing the hardcover amounts as noted. Lindquist noted this <br />application is for new construction. Gaffron explained the necessary changes to move all <br />structure behind the 75- setback. <br />Hawn suggested making the driveway more narrow and perpendicularly connecting it to the <br />house. Kiernan said the costs would then double. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.