My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-21-1997 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1997
>
04-21-1997 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:28:27 PM
Creation date
7/10/2019 2:28:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C� <br />J <br />u <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON APRIL 21, 1997 <br />(#I - Telecommunications Ordinance - Continued) <br />Alexander said the City could expect a challenge to their ordinance if the towers prove <br />area inadequate due to structure capability, height, overcrowding, and coverage. This <br />would resultt in the need for additional antenna sites to provide service. Alexander said he <br />would provide the specific provisions in a follow -up comment letter. Lindquist later asked <br />that this comment letter be sent in a timely manner. <br />Alexander indicated another method could be to create incentives for the <br />telecommunication companies to use the water towers. He suggested the antennas be a <br />permitted use with administrative permission or subject to conditional use in different <br />districts (industrial, commercial, etc.) and performance standards instead of prohibiting <br />them altogether. He noted the minimum height required is 75'. It costs $150,000 to <br />$250,000 to construct a tower which the companies will avoid if locations for antennas <br />can be found on existing structures. <br />Alexander informed Lindquist that co- location can occur if the newest provider conducts <br />an interference analysis. He indicated the horizontal separation between antennas must be <br />20 -25'. He indicated his company prefers co- location whenever possible subject to a <br />lease. He asked who the consultant was that assisted with the ordinance review. Van <br />Zomeren reported the consultant was John Dubois. <br />Van Zomeren reported that City Attorney Radio has indicated the ordinance is reasonable <br />and provides for the City to be covered. He had noted that it is not clear what the FCC <br />allows or disallows. Alexander argued that if the water towers are not suitable to the <br />needs of the PC S, it would render the ordinance as prohibitive. <br />Smith asked if the need for additional antenna locations from that allowed by the proposed <br />ordinance currently exists or if the concern regards possible fixture needs. Alexander felt it <br />affects the current condition and future. He noted the company is unaware of what sites <br />will be used, but the restriction on the tower could possible place the service in jeopardy. <br />Alexander said APT is currently in Phase I of implementation, and Orono is in Phase 2. <br />He indicated the criteria that must be met includes 1) radio frequency, 2) coverage, 3) <br />linkage with sites, i.e. leaseability, space availability, structural adequacy, and 4) land <br />being buildable for antennas and towers. <br />Lindquist noted that the law is ever - changing regarding this new technology. Alexander <br />responded that the 1996 Telecommunications Act provides for the needs. Cities are told <br />to act quickly, moratoriums are allowed, but must be timely, and the service cannot be <br />prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.