My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-1996 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1996
>
08-19-1996 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:07:31 PM
Creation date
7/10/2019 2:07:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON AUGUST 19, 1996 <br />• <br />( #11 - #2167 Allen and Judy Schefers - Continued) <br />Gaffron noted the elusiveness of the application with the steady stream of changes made <br />from the original proposal. He reported that the original house was planned within the <br />flood plain and with the lowest floor level below the Regulatory Flood Protection <br />Elevation (RFPE). The 75 -250' hardcover was also proposed at about 32% where only <br />25% is allowed. The lot is vacant, and a new house is now proposed for which there is no <br />justification for hardcover variances. The house has now been raised to the required <br />935.5' elevation and out of the flood plain. With the changes to the location, the size of <br />the house, and the driveway, the house now will meet the 25% hardcover. The only <br />request remaining is for a CUP for fill importation in excess of 100 cubic yards. It would <br />require 300 -400 cubic yards of fill for this proposal. Gaffron noted there is also no <br />defined average lakeshore setback to meet as there is no house to the south. The house <br />will be located some distance back from the 0 -75' setback. The hardcover in the 75 -250' <br />setback is proposed at 24.97 %. Gaffron said the plan is realistic. He said the fill would <br />require around 30 truck loads. Documentation by a survey showing hardcover <br />calculations will be required. <br />Peterson noted that the normal precautions would be required regarding fill such as road <br />clean up. <br />• Smith moved, Lindquist seconded, to approve the request for a CUP for fill in excess of <br />100 cubic yards with the inclusion of a survey. Vote: Ayes 5, Nays 0. Hawn was absent <br />from the vote. <br />• <br />PLANNING COMMISSION COMMENTS <br />( #12) REPORT OF PLANNING COMMISSION REPRESENTATIVE <br />ATTENDING COUNCIL MEETING OF AUGUST 12, 1996 <br />No report was given. <br />( #13) PLANNING COMMISSION APPROVAL OF MINUTES OF THE JULY 22, <br />1996 MEETING <br />Lindquist moved, Peterson seconded, to approve the Minutes of the Planning Commission <br />Meeting of July 22, 1996. Vote: Ayes 5, Nays 0. Hawn was not present for the vote. <br />( #14) PLANNING COMMISSION TO SELECT A REPRESENTATIVE TO <br />ATTEND THE COUNCIL MEETING OF SEPTEMBER 9, 1996 <br />Stoddard will attend the September 9, 1996 meeting of the Council. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.