Laserfiche WebLink
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JULY 15, 1996 <br />• <br />( 0) #2135 PAUL AND SUE HEDLUND/EDNA ALBEE ESTATE, 1575 LONG <br />LAKE BOULEVARD - VARIANCES - CONTINUATION OF PUBLIC HEARING <br />7:1 8-7:54 P.M. <br />Members of the Edna Albee family were present, along with Burnet Realtor, Jeff <br />Martineau. <br />Gaffron recalled the application being before the Commission at their May meeting for a <br />proposed addition to the structure to include removal of a detached garage, a new <br />attached garage, an addition, a second story addition, and driveway. There are concerns <br />over hardcover excess, the placement of the garage to the street and side of the property, <br />and the septic /sewer situation. Gaffron said the proposed buyers of the property, the <br />Hedlunds, are currently not pursuing the application; but the property owners would like <br />to continue with the application in order to determine what can be done with the property. <br />Gaffron continued in reporting on the hardcover, which will decrease from the existing <br />1195 s.f. to 1185 s.f., rather than the originally proposed increase to 1280 s.f. Hardcover <br />in the 75 -250' zone will increase from 887 s.f. to 1467 s.f., rather than to 1783 s.f as <br />originally proposed. The net hardcover results in an increase from 2082 s.f. to 2652 s.f <br />rather than to 3063 s.f as originally proposed. This would be equivalent to the 25% <br />allowed in the 75 -250' setback. The garage, now proposed at 34' from the side lot line, <br />will now meet the required 30' side setback. This revised proposal moves the garage to a <br />location 8' from the street property line and out of the public right -of -way, rather than F <br />from the line as originally proposed. <br />Gaffron said the applicants ask to rehab the house to no more than 2 bedrooms. The <br />existing septic tanks will be disconnected from the drainfield and a fully executed pumping <br />contract from a licensed contractor will be supplied to the City. The owner will also draft <br />and record a restrictive covenant on the chain of title for the property stating a 3rd <br />bedroom would not be allowed until City sewer has been obtained and installed. The <br />closet in the main floor den must be walled off, which will incur the need for a building <br />permit if it is rebuilt to create a third bedroom. Gaffron noted that the existing septic tank <br />may only need a plug for the outlet, which would result in a minimal cost. If no sealed <br />tank is found when inspected, however, a new tank would be required, and might cost the <br />applicant about $2000. <br />Gaffron reviewed other issues of concern. The second story addition would be located 49' <br />fi-om the lake, where 100' is required. A variance for an 8' street setback would be <br />necessary, where 50' is required in the 2 -acre zoning district. There would be an average <br />lakeshore setback encroachment of 32'. It was noted that even though almost all of the <br />house is within the lakeshore setback, it would not encroach on the views enjoyed by the <br />adjacent neighboring properties. The hardcover will stay within the guideline for the <br />• overall hardcover. There is a bluff issue on the west side. Some filling would result from <br />the project and erosion control measures will be necessary during construction. <br />