My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-20-1996 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1996
>
05-20-1996 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:05:42 PM
Creation date
7/10/2019 2:05:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MAY 20, 1996 <br />• <br />( #1 - #2136 Greenfield Corporation - Continued) <br />Jim Pfennig of Greenfield Corporation asked to respond. He noted that the property to <br />the east, which is proposed to have road access from Outlot B, has an outlot access <br />located more to the east. Regarding the septic site discussion, Pfennig said the subdivision <br />would have an architectural review committee and covenants. He thought the first owners <br />would have knowledge of the septic sites but did not know if that would continue with <br />subsequent owners. <br />Pfennig remarked concerning lot 1 and the 200' frontage on the County roads. He noted if <br />Outlot A was extended to the west, there could be more frontage, but he did not believe it <br />would make sense to blacktop in order to gain the 200' width. He also noted that the type <br />1 and 2 wetlands go up to Win elevation, which is unusual. Gronberg added that alot of <br />the area will not be landscaped. He envisioned lawn for the areas adjacent to building sites <br />and road but then leaving the remainder natural. Pfennig said the initial plans were to <br />plant in alfalfa. <br />Gronberg commented that there is a loss of 70' with Outlot B and the 50' road setback <br />rather than a 30' side setback at east lot line. Outlot B will not benefit this development. <br />Gronberg said he saw the development as similar to a PUD with clustering to the north, <br />but saw no problem with the septic sites being close together as it does not interfere with <br />• the wells. <br />Peterson asked about easements. Mabusth said the City will asking for a bike easement <br />along North Shore Drive and Bayside Road. The County has recently shown a <br />comprehensive bike trail plan along North Shore Drive on the east side. The Park <br />Commission asked for a bike trail within the drainage and utility easement. Mabusth said <br />there is an issue with lots 5 and 6 regarding additional right -of -way. There will be a 10' <br />easement. Mabusth said Weckman informed her the bike trail easement of 10' will not <br />impact lots 5 and 6. The County's comprehensive plan calls for 46' of additional right -of- <br />way and trail easement. The City will ask for only 10' of bike trail easement and no <br />additional right -of -way adjacent to lots 5 and 6. <br />There were no public comments. <br />Lindquist asked what different would occur regarding width if outlot B was eliminated. <br />Gronberg said lot 3 and 4's lot widths would be expanded. Lot lines would be moved with <br />lot 4 to the east and lot 3 would be alittle larger. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.