My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
11-20-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:55:26 PM
Creation date
7/10/2019 1:55:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON NOVEMBER 20, 1995 <br />• <br />( #6 - #1958 Louis Oberhauser - Continued) <br />Hawn said she saw the structures as clearly being in violation and hideous. Hawn said any <br />improvement would be a benefit but was concerned with two substandard lots requiring <br />hardcover and structural variances. She said she was willing to look at the application <br />only because of the hideous condition of the structures. Hawn said she was very <br />concerned with this being adequate grounds for approval and had a serious problem with <br />it. <br />Neveaux said the City and the property owner want the improvement. He noted that <br />other proposals have been turned away and considered this a last ditch effort. Neveaux <br />said in site of the numerous variances that exists on the property, the outcome would be <br />beneficial. He felt the past should be put behind and move forward. Neveaux said the <br />wedge of land of Casco /Spring Park was a transitional group of lots. He noted that one <br />lot was not economically feasible and out of character with the lot and area. He felt the <br />proposal blends in with the neighborhood. <br />Peterson said that was not a concern. He did want the structure to come down and did <br />want the subdivision. He felt if there was to be a replat, he recommended 2 lots. <br />• Mabusth suggested a possible redesign questioning puting a large house within the smaller <br />envelope. She saw no reason to grant a setback variance to lakeshore setback for Lot 1 as <br />the building area could be rearranged to meet the setback. Mabusth said the proposal has <br />merit but again was concerned with setbacks and the lack of any real site planning. <br />• <br />Peterson asked why a larger house on a smaller lot. Neveaux said it was only a general <br />plan. He said the site and access availability was limited and looked at the aesthetics. It <br />was the applicant's intent to eliminate the setback variance required on lot 1 but limit the <br />other. <br />Mabusth noted the sewer easement along the west line and the utility easement on the line. <br />A shared access was recommended from CoRd 15. The County was in favor of the shared <br />access also. The County saw the Dunwoody access as dangerous. Neveaux said this was <br />fine with Oberhauser. He was asked if he was aware of the utility easement. Neveaux <br />said he was but not necessarily to the placement of the easement <br />Lindquist said he did not conceptually disagree but did not want to see any hardcover in <br />the 0 -75' zone. He did not wish to see any new construction in this area. He would not <br />approve any structural lot coverage variance or hardcover variance in the 0 -75' zone but <br />would consider a hardcover variance. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.