My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
08-21-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:52:20 PM
Creation date
7/10/2019 1:52:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />C� <br />• <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON AUGUST 21, 1995 <br />( #18 - 92047 Lakeview Golf - Continued) <br />Peterson commented that the Park Commission reviewed the sketch plan and did not <br />propose a trail on the property but would ask for normal park dedication fees. The <br />applicant was informed that this amount would be 8% of the lot area or cash in the <br />equivalence of 8% of the fair market value before development. <br />( #19) #2053 DENNIS PLATTETER, 809 NORTH BROWN ROAD - SKETCH <br />PLAN OF A 3 -LOT RESIDENTIAL SUBDIVISION <br />Mr. Platterer was present. <br />Mabusth reported that the plan is for a division of a 6.37 acre homestead, located to the <br />north side of Sugar Woods development, into three lots. All structures would be <br />removed. The property is accessed via a platted road. The property is on a natural <br />environment lake to the northwest, the OHW is at 985.5 elevation. .4 of the total <br />property is a type 3 wetland adjacent to the normal high water level. Each lot is shown <br />meeting the two acres of dry buildable. It was noted that if the road were moved to the <br />west, the lots would not have the 2 acres of dry buildable required. Lot 2 requires a lot <br />width variance in its present configuration. <br />Mabusth reported that the septic would be mound -type systems, and 3 were tested at an <br />8% slope. The septic code specifically states that mound systems must be placed on a <br />slope no greater than 6 %. Staff could not recommend approval of 3 lot plat based on <br />septic limitations. The property is not located within MUSA. <br />Mabusth asked the Commission if they would recommend approval of current layout? A <br />lot width variance would be required for lot 2 that gains access via a long platted corridor. <br />The lakeshore lot meets 200' at the lake and the 150' setback. <br />Platterer said he has owned the property for 20 years. The MUSA line is adjacent to the <br />property to the south. The property contains alot of sandy area. The applicant selected <br />the building sites based on the views, maintenance of trees and slopes, and then <br />constructed the lot lines to meet the codes. <br />The applicant was informed that with a 150 -200' long road, his likely choices would be for <br />3 executive lots or 2 hobby farms, with contemplation for larger cul -de -sacs required by <br />the fire department. <br />Peterson said it was his opinion that the property consisted of two lots, not three, as there <br />would be too much crowding in order to gain the proper septic. Berg agreed with this <br />conclusion. <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.