My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
07-17-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:51:16 PM
Creation date
7/10/2019 1:51:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JULY 17, 1995 <br />• <br />(#10 - #2041 Phil & Darcy Otto - Continued) <br />Mabusth said additional fill from the excavation was placed in the rear yard. The Otto's <br />are attempting to provided a gentler slope to the rear yard. The problem at the east side <br />has been intensified. The problem now is how to deal with the finished elevations at the <br />east yard at 15' width and maintain 2:1 slope, and also allow walking access to rear yard. <br />Mabusth said it would be necessary to contact the property owner to the east to gain <br />approval of any encroachment. The property is possibly in the in the process of going tax <br />forfeit. <br />Mabusth said detail on elevations, catch basins, and final grades are needed. Planning <br />Commission is unable to make any further recommendations until the criteria established <br />engineer is addressed. Mabusth asked the Commission if they prefer to revisit the <br />application prior to going to the Council. The landscaping plan would be done at that <br />point. The Commission had no problem with the application going forward if it met the <br />criteria of the Engineer. It was recommended that the landscape architect work with the <br />City Engineer. <br />Glen Sauer of 4104 Highwood reported his concern with drainage from this lot exceeding <br />the capacity of the ditch and retaining pond on his property. Sauer does not want this <br />• property to further impact his yard. Pictures from heavy rains in 1978 and 1987 were <br />shown to emphasize the problems. <br />Sauer said he was concerned with the filling in the Otto's back yard and the change in the <br />slope in that area. It is Sauer's opinion that how fast the drainage flows does not matter. <br />Sauer says it all will eventually go through the 20' culvert with 8" tiles. He does not want <br />any fill to hamper any of the retention areas. It was noted that the gentler slope may aid in <br />water seeping down into the ground of the Otto property. Mabusth said the fill and sod <br />should decrease the velocity of the flow. Sauer said there is no more storage capacity <br />available. <br />Mabusth said she would have Glenn Cook review the drainage issue with Shawn <br />Gustafson. Cook is familiar with the drainage history of the area. The Planning <br />Commissioners said this further information will need to be studied. <br />Lindquist moved, Berg seconded, to table Application #2041 for further engineering <br />review by City Engineer Cook. Planning Commission would like to receive confirmation <br />on what will occur to the retention areas further downstream. Ayes 4, Nays 0. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.