My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
05-15-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:47:44 PM
Creation date
7/10/2019 1:47:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MAY 15, 1995 <br />( #10 - #2017 William Hibbs - Continued) <br />Nolan acknowledged the need for an apron on the drive but asked that area limitations be <br />set. Mabusth said the back -up are was included in the hardcover proposals. The detailed <br />site plan will be submitted prior to the application going before the Council. <br />Nolan moved, Lindquist seconded, to approve Application #2017 for variances to <br />hardcover, structural coverage, side and street setbacks subject to apron dimensions being <br />established before going to the Council meeting. Ayes 5, Nays 0. <br />( #11) #2018 RICHARD BORN, 1991 FAGERNESS POINT ROAD - <br />CONDITIONAL USE PERMIT - PUBLIC HEARING - 9 :33 -9:37 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />Mr. Born was present. <br />Mabusth reported that the application is for a CUP to install a permanent dock. The dock <br />is existing but the applicant is asking to expand it. There are no setback problems. The <br />DNR has issued a permit, which Staff has received a copy. The applicant will need to <br />review his proposal with the LMCD. The applicant responded that he has begun this <br />application process. <br />Mabusth commented that the visiting Planning Commissioners remarked on the <br />construction of the railing on the upper deck. A permit was issued for a new rail. The <br />original rail was of solid construction. The new railing will be more open. Approval was <br />given in 1991 for this construction. <br />Nolan commented on the landscaping on the lakeshore portion of the lot, which has plastic <br />underlayment. The Applicant responded that this was installed when he bought the <br />property. Peterson informed the Applicant that the plastic is considered hardcover and <br />would be desirable if removed. <br />Lindquist moved, Berg seconded, to approve Application 92018, subject to LMCD <br />approval. Ayes 5, Nays 0. <br />( #12) #2019 LEISEL COX, 3445 SHORELINE DRIVE - CONDITIONAL USE <br />PERMIT - PUBLIC HEARING 9:37 -9 :43 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />Leisel Cox was present. <br />• <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.