Laserfiche WebLink
• <br />• <br />• <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MARCH 20, 1995 <br />(#4 - #1999 - David and Vicki Vickerman - Continued) <br />Mabusth responded that the only allowed structure would be the 4x8' landing as part of <br />the access stair structure. Rowlette informed the applicant that the area where the <br />boathouse is would need to be stabilized but could provide an area to sit and enjoy the <br />lake but no deck would be allowed. The need to eliminate hardcover in the 0 -75' zone <br />was emphasized. The applicant was informed that open - timbered decking is considered <br />hardcover because the timber does not absorb water. The deck as proposed would not <br />allow any vegetation to grow underneath it and would result in runoff into the lake. <br />Added vegetation on properties to improve water runoff was discussed. <br />The applicant was informed of the need for a plan for the removal of the boathouse with <br />stabilizing of the area possibly through retaining walls. If retaining walls are required, a <br />conditional-use permit would also be required. The Planning Commission would review <br />the plans for approval which would be forwarded to the Council for final approval. It was <br />reemphasized that the code only allows for a 4x8' landing on the access stairs. <br />Schroeder moved, Nolan seconded, to table application #1999 until the April Planning <br />Commission meeting. At that time, the applicant will present a plan for the boathouse <br />removal, hill stabilization, and landing; amending the original application to a conditional <br />use permit. Ayes 7, Nays 0. <br />(#5) #2001 POWDER PACKERS, INC./RHONDA E. WILSON, 640 ORCHARD <br />PARK ROAD - VARIANCE - PUBLIC HEARING 8:22 -8:36 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />The Applicant, Ms. Filson, was present. <br />The application is for a front/street setback variance where 100' is required, for a 33x23' <br />garage and 4x12' entry. The setback proposed is for 75' at the entry addition and 71.'7' at <br />the garage addition where the existing residence is located at 757. There is an existing <br />overhang that travels the length of the residence. The proposed entry would extend 2' <br />beyond the overhang. When the house was originally built in 1959, the five -acre zone <br />standards did not apply. The property is 4.79 acres in a 5 -acre zone, which had been <br />changed after the construction of this house. The addition will meet the required 10' <br />separation setback from the tennis court. <br />Smith asked why the garage was moved forward from the rest of the house. The applicant <br />responded that this provided a thru corridor right into the house entry door. <br />The driveway plans were shown to the commissioners. <br />6 <br />