My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
01-17-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:43:36 PM
Creation date
7/10/2019 1:43:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JANUARY 17, 1995 <br />•( #3 - #1981 Todd R. Coumeya - Continued) <br />Nolan moved, Rowlette seconded, to approve Application #1981 subject to review and <br />acceptance by the City of a professional drainage plan, a comprehensive landscape <br />stabilization plan, as well as an erosion control plan requiring periodic inspections by the <br />City Engineer. Ayes 6, Nays 1, Smith. Smith's opinion is that the plan should move the <br />house away from the smaller hill. <br />(#4) #1986 DAVID YORKS, 2825 CASCO POINT ROAD - AFTER -THE -FACT <br />CONDITIONAL USE PERMIT/VARIANCE - PUBLIC HEARING - 8:20 -8:30 <br />P.M. <br />The Affidavit of Publication and Certificate of Mailing were noted. <br />Mrs. Yorks was present. <br />Schroeder read a letter addressed to the City from Dave Stockdale of Edgework Builders, <br />the contractor for the application, to be included as part of the public record, stipulating <br />confirmation that proper construction procedures were followed for the retaining wall as <br />required by the City. <br />isMabusth said the application was an emergency situation that developed after the <br />November Planning Commission meeting requiring the City to make a decision without <br />first coming before the Commission and Council for approval. It was discovered that the <br />retaining wall at the top of the bank leading to the lake was in a near state of collapse and <br />measures needed to be taken immediately to safeguard bank before spring thaw and rains. <br />The contractor failed to call for inspections during the reconstruction of walls, although, <br />contractor did work with the City Engineer on the project. Since inspections would not <br />confirm that the wall had been installed as required, the Engineer asked that a letter be <br />submitted for the record. <br />There were no public comments. <br />Rowlette felt there should be no after- the -fact penalty due to the circumstances. <br />Rowlette, moved, Nolan seconded, to approve Application # 1986 for an after- the -fact <br />conditional use permit and setback variance for retaining wall with the recommendation <br />that no penalty be assessed. Ayes 7, Nays 0. <br />( #5) #1987 LARRY PILLAR, 2705 ETHEL AVENUE - VARIANCE - PUBLIC <br />HEARING - 8:30 -8:40 P.M. <br />• The Affidavit of Publication and Certificate of Mailing were noted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.