My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00876 - gazebo
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
220 Wakefield Road - 36-118-23-31-0010
>
Permits/Inspections
>
2015-00876 - gazebo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:18 PM
Creation date
7/8/2019 2:11:38 PM
Metadata
Fields
Template:
x Address Old
House Number
220
Street Name
Wakefield
Street Type
Road
Address
220 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orono, MN Code of Ordinances Page 3 of 3 <br /> 2. Pumping chamber. <br /> L Pressure pipe exiting the pumping chamber must be laid on a uniform slope up to the soil treatment <br /> area for proper drain back.The pressure pipe must be sleeved inside a larger diameter pipe for <br /> additional support if spanning ground that has been excavated. If the pipe at the tank must be lower <br /> than union to get elevation for drain back,a one-quarter-inch weep hole must be used. <br /> ii. When the soil depth above the pressure distribution pipe is less than 334 feet,insulation must be <br /> added to achieve an insulating factor equal to 3Yz feet of soil to decrease the potential for freezing <br /> (Styrofoam or concentric piping are acceptable methods).Piping under hardcover,such as tennis <br /> courts or driveways,shall be insulated pipe or equivalent. <br /> iii. A reserve capacity equaling 75 percent of the anticipated daily flow must be allowed in the pumping <br /> chamber between the alarm activation level and the <br /> pump tank inlet. <br /> d. Drainfields. <br /> 1. Trenches.Trenches must meet Minnesota Rules chapter 7080. <br /> 2. Mounds and at grades. Mounds and at-grades must meet specifications per Minnesota Rules chapter 7080. <br /> (3) Compliance standards. <br /> a. A new system shall be located,designed and constructed as a code system. <br /> b. When an existing code system is repaired or expanded,such ISTS shall remain a code system.Compliant <br /> systems,when repaired,shall be upgraded to a code system status whenever such classification is reasonably <br /> attainable. <br /> (4) Construction procedures. <br /> a. Protection of drainfield area. Proposed drainfield areas shall be identified and marked off on the lot at the time <br /> of the site evaluation and prior to any construction or grading occurring in the area.The drainfield area shall <br /> remain undisturbed until drainfield construction is commenced. No vehicular traffic shall be allowed in the <br /> drainfield area either before or after drainfield installation. <br /> b. Favorable weather required. Drainfield area or trench construction must not proceed if the area is wet or has <br /> had rain within 48 hours.Mound or trench construction shall not proceed unless the soil moisture content is <br /> below the plastic limit. <br /> c. Construction inspection required.The contractor issued a permit for ISTS construction shall perform all work <br /> according to the design specifications approved by the city for each particular ISTS.All subsurface work, <br /> including building sewer,sewage tanks,distribution system and soil treatment area shall be inspected by the <br /> city inspector prior to backfilling or covering of any portion thereof.It shall be the responsibility of the <br /> contractor to notify the city at least 24 hours prior to the time an inspection will be required,and it shall be the <br /> responsibility of the contractor to ensure that the inspection is accomplished and the construction is approved <br /> prior to any backfilling,covering or continuation of the construction. <br /> (Code 1984,§ 12.30(5);Ord.No. 100 2nd series,§4,2-10-1992;Ord.No. 147 2nd series,H 11-15,5-13-1996;Ord.No. 199 <br /> 2nd series,§ 1(12.30(5)),5-8-2000;Ord.No.38 3rd series,§1,9-24-2007) <br /> about:blank 7/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.